United
States Environmental Protection Agency
Region 4
POLLUTION REPORT
|
Date: |
Wednesday, October 15, 2003
|
From: |
Charlie Fitzsimmons, OSC
|
To: |
bob bittinger, Region IV ERRB
|
Charlie Fitzsimmons, Region IV ERRB
|
Subject:
|
Ongoing
Spectra Designs Inc
1908 West Marlboro Rd., Farmville, NC
|
POLREP No.: |
2
|
Site #:
|
A4BS
|
Reporting Period: |
07/14/03 - 10/15/03
|
D.O. #:
|
|
Start Date: |
7/10/2003
|
Response Authority:
|
CERCLA
|
Mob Date: |
7/10/2003
|
Response Type:
|
Emergency
|
Completion Date: |
|
NPL Status:
|
Non NPL
|
CERCLIS ID #: |
NCN000407653
|
Incident Category:
|
Removal Action
|
RCRIS ID #: |
|
Contract #
|
ER PO
|
Refer to ER-Action Memo dated 07/14/03.
|
EPA OSC and removal contractor (EEM) performed followup site stabilization activities on 07/14/03. Hazardous substances were identified and packaged for transport. Fourteen separate wastestreams were established via hazcatting. Profiles for each wastestream were generated and submitted to Chemtron Inc, Avon, Oh. Chemtron provided a T&D cost proposal based on their evaluation of the profiles.
The OSC than began work with Region IV EAD regarding enforcement. Numerous attempts to reach the property owner for signature on access letter and notice letter were rejected. Hurricane Isabel passed thru the general area of the site in September causing minimal damage. On October 1, 2003, EAD was finally able to obtain the requisite signatures.
|
Issuance of ER PO to Chemtron for final T&D of all CERCLA haz substances. Anticipate final removal activities to occur on October 23, 2003.
|
Final T&D of materials and final polrep.
|
Enforcement activities took way too long. Property owner had previously provided verbal access and was completely aware of our actions and was provided the opportunity to perform any and all activities under OSC oversite. OSC would like to complete this removal before the next hurricane.
|
|
Budgeted |
Total To Date |
Remaining |
% Remaining |
Extramural Costs
|
ERRS - Cleanup Contractor |
$45,000.00 |
$5,000.00 |
$40,000.00 |
88.89% |
Intramural Costs
|
USEPA - Direct (Region, HQ) |
$25,000.00 |
$5,000.00 |
$20,000.00 |
80.00% |
USEPA - InDirect |
$25,000.00 |
$0.00 |
$25,000.00 |
100.00% |
|
Total Site Costs |
$95,000.00 |
$10,000.00 |
$85,000.00 |
89.47% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.