NuWay Dry Cleaners

Images

All Images [10]
Categories
Image  Description Category Date Tags
Laying pea gravel in east lateral trench.JPG<br />Date Taken: 8/28/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Placing one foot of pea gravel over extraction pipelines. The only slotted PVC pipe is the single string of pipe running the length of the east lateral trench in zone 4. Site Photo 8/28/2010
West lateral trench completed except for sand slurry.JPG<br />Date Taken: 8/28/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Completed west lateral trench, except for sand slurry. Yellow fabric is the Stego Vapor Barrier Site Photo 8/28/2010
Close-up of pipeline and risers.JPG<br />Date Taken: 8/28/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Close-up photo of completed construction of horizontal extraction well system. Risers are extended above grade in west lateral trench Site Photo 8/28/2010
P8280131.JPG<br />Date Taken: 8/28/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: ERRS installing the last piping string for the horizontal extraction well system. Each pipeline can be used to isolate any of the four extraction zone during operation of the SVE system. The risers are capped at the top. Site Photo 8/28/2010
IMG_0035.JPG<br />Date Taken: 8/27/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Completed construction of subslab depressurization system for the school administration building. Began operation on 8/26/2010. Site Photo 8/27/2010
NuWay piping from 3 separate extraction zones entering lateral trench.JPG<br />Date Taken: 8/25/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Pipelines for extraction wells zones 1,2 and 3 are seen taking a 90 degree turn into west lateral trench and through the cement slurry vapor barrier wall at south end of trench Site Photo 8/25/2010
Nuway - placing cement slurry to finish E-W horizontal VEW.JPG<br />Date Taken: 8/24/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Cement slurry being placed on top of pea gravel infiltration gallery and Stego vapor barrier for horizontal extraction well in zone 2. Site Photo 8/24/2010
IMG_0037.JPG<br />Date Taken: 8/27/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: ERRS excavation of east lateral trench in hotspot area (zone 3). Horizontal extraction well gallery and piping will be laid in the bottom of the trench Site Photo 8/27/2010
NuWay Dry Cleaners Site.JPG<br />Date Taken: 8/25/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: NuWay Dry Cleaners Site, Victorville, CA. Photo taken from top of hill facing west/southwest Site Photo 8/25/2010
IMG_0009.JPG<br />Date Taken: 8/24/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Cement sand slurry being laid over pea gravel and slotted PVC pipe in extraction zone 2 for SVE system Site Photo 8/24/2010