Date:
Tuesday, February 17, 2009
From:
Stavros Emmanouil/Craig Thomas

To:
Craig Thomas, USEPA/ERB/RS III
Stavros Emmanouil, U.S. EPA/ERB/RS III
Jason El-Zein, U.S. EPA, ERB 1
David Chung, U.S. EPA
Melinda Dejewskie, City of St. Francis
Andrew Boettcher, Wisconsin DNR
Franklin Lockwood, City of St. Francis
Nola Hicks, U.S. EPA
John Maritote, U.S. EPA
Bill Ryczek, U.S. EPA
Roxanne Chronert, WDNR
Linda Nachowicz, U.S. EPA
Charles Gebien, ERB/RS III

Subject: 

Continuation of Removal Action
St. Francis Auto Wreckers
4043 South Pennsylvania Avenue, St. Francis, WI
Latitude: 45.9714000
Longitude: -87.8800000


POLREP No.:
12
Site #:
B5LD
Reporting Period:
2/9/2009 thru 2/13/2009
D.O. #:
0015
Start Date:
10/20/2008
Response Authority:
CERCLA
Mob Date:
10/20/2008
Response Type:
Time-Critical
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
WID988639068
Contract #
EP-S5-08-02
RCRIS ID #:
 

Site Description

See initial PolRep


Current Activities

Continued the air monitoring of both the perimeter and the work area.

Transported and disposed of approximately 250 tons of PCB-contaminated soils (approximately 2475 total tons).

Continued the excavation of areas of concern.  Approximately 490 cubic yards of contaminated soils (3325 total cubic yards), 39 drums (490 total drums) and 0 paint cans (67 total paint cans) were excavated.

Collected samples of excavated soils and sent to an outside lab for analysis.

Five test pits were excavated in the access roads along the east and north site property boundaries.  Samples were collected and sent to an outside lab for analysis.


Planned Removal Actions

Remove and Sample Drums & Containers.

Sample soil stockpile & generate waste profiles.

Perform Hazard Categorization.

Excavate/Treat Impacted Soils, as necessary.

Transport/Dispose Drums & Impacted Soils.

Backfill & Grade Excavated Areas.

Restore Site, as necessary.


Next Steps

Transportation and disposal of treated soils.

Continue the excavation of contaminated soils and buried drums to four feet below the surface.

Continue the air monitoring and sampling activities.

Continue the treatment of the mixed PCB waste.


Key Issues

Secure funding for the continuation and completion of the project.


Estimated Costs *
  Budgeted Total To Date Remaining % Remaining
Extramural Costs
ERRS - Cleanup Contractor $892,963.00 $811,965.76 $80,997.24 9.07%
RST/START $79,420.00 $66,230.70 $13,189.30 16.61%
Intramural Costs
 
Total Site Costs $972,383.00 $878,196.46 $94,186.54 9.69%

* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.


Disposition of Wastes


Waste Stream Quantity Manifest # Disposal Facility
PCB Contaminated Soil  2475  004659676JJK thru 004659683JJK; 004659706JJK; 004659707JJK  Wayne Disposal, Belleville, MI 


response.epa.gov/stfrancisautowreckers