OCS Tanner contracted WRS to perform the response actions. These actions consisted of collection and disposal of the waste oil in the above ground storage tanks (34 tanks), waste liquids from drums within the warehouse, and contaminated soils. The contractor was also tasked to clean and dispose of above ground storage tanks.
The waste oils were removed from the site for disposal on August 16, 2008. The oil contaminated soils were transported off-site for disposal on October 1, 2008. Pressure washing of the aboveground tanks began on December 1, 2008. All waste material associated with the tanks were transported off-site for disposal on December 19, 2008. All personnel demobilized from the site on December 19, 2008.
|