POLLUTION REPORT
|
| Date: |
Thursday, February 26, 2009
|
| From: |
Laura Casillas, Chris Wagner
|
| To: |
Fran Burns, USEPA R3
|
EPA RRC EPA RRC, EPA RRC
|
|
Subject:
|
Second Round of Residential Well Sampling Complete
Allied Terminals Response
501 Hill Street,
Chesapeake, VA
Latitude: 36.7955654 Longitude: -76.2870026
|
| POLREP No.: |
12
|
Site #:
|
A3MD
|
| Reporting Period: |
1/17/2009-2/27/2009
|
D.O. #:
|
|
| Start Date: |
11/12/2008
|
Response Authority:
|
CERCLA
|
Mob Date: |
|
Response Type:
|
Emergency
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Assessment
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
|
|
This polrep focuses on Site activities from January 17th, 2008 through February 27, 2008. For more information regarding the incident or EPA's previous activities, please see previous polreps.
The Chesapeake Fire Dept. requested that EPA maintain a presence on the Site until work in the residential areas was completed.
|
|
During this period EPA sampled drinking water wells at two residences on Bannister street for Nitrates and Nitrites. On January 26, 2009 EPA received permission from homeowners to take the samples. EPA returned on Wednesday February 4, 2009 to sample the wells.
EPA OSC Laura Casillas received validated analytical data on February 25, 2009. The data shows that Nitrates and Nitrites were not detected. Nitrates and Nitrite levels are within safe drinking water parameters. Results are posted under the documents section of the www.epaosc.org allied terminals site.
Allied terminals continues to pump residues that flow onto the ditches and to do weekly air monitoring.
|
|
EPA will continue to monitor the status of residues that make their way onto street ditches.
Allied is working with the VDEQ to address potential storm water permitting issues from potential off-site migration of fertilizer residues.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
|
Intramural Costs
|
| |
| Total Site Costs |
$0.00 |
$0.00 |
$0.00 |
0.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/AlliedTerminalsResponse
POLREP #12 Last Updated 2/26/2009
|