POLLUTION REPORT
|
| Date: |
Tuesday, March 17, 2009
|
| From: |
Robert Wise
|
| To: |
ERT Support,
|
Robert Wise, EPA
|
|
Steve Calanog, EPA
|
Peter Guria, EPA
|
|
Jim Hanson, EPA
|
Daniel Meer, EPA
|
|
Tom Dunkelman, EPA
|
Michelle Rogow, EPA
|
|
Janet Yocum, EPA
|
Will Duncan, EPA
|
|
Rich Martyn, EPA
|
Donn Zuroski, EPA
|
|
Craig Benson, EPA
|
Martin Powell, EPA
|
|
Jason Musante, EPA
|
Harry Allan, EPA
|
|
Chris Weden, EPA
|
Bret Moxley, EPA
|
|
Hedy Salter, EPA
|
Peter Reich, EPA
|
|
Paul Casa Grande, EPA
|
Peggy De La Torre, EPA
|
|
Barbara Lee, EPA
|
Ivania Brown, EPA
|
|
Mark Samolis, EPA
|
Celeste Temple, EPA
|
|
Steven John, EPA
|
Eugene Rainwater, EPA
|
|
Sherry Fielding, EPA
|
Carole Kirby, EPA
|
|
Kevin Sligh, PST
|
Pat Port, DOI
|
|
NPFC POLREPS, NPFC
|
Lt. Brian Gollhopher, DFG
|
|
John Holland, DFG
|
Melissa Boggs-Blalack, DFG
|
|
Josha Curtis, DFG
|
Kenneth Wilson, DFG
|
|
George Baker, DTSC
|
Harvey Packard, RWQCB
|
|
Chad Gibson, START
|
Ed Brannon, DOGGR
|
|
Damian Higgins, USFWS
|
Greg Haas, Congression Staffer
|
|
Josh Neipp, SBCOFD
|
Richard Todd, SBCoFD
|
|
Kate Sulka, SBCFD
|
Mike Connell, CADFG OSPR
|
|
Mike Zimmer, SBCO Petroleum Office
|
Denise Steurer, USFWS
|
|
Ian Zelo, NOAA
|
Mary Simms, EPA
|
|
Becky Stanton, OSPR
|
|
|
Subject:
|
Final POLREP
Greka Bell Lease 3
6801 Palmer Road,
Santa Maria, CA
Latitude: 34.8279500 Longitude: -120.3254400
|
| POLREP No.: |
13
|
Site #:
|
|
| Reporting Period: |
|
D.O. #:
|
|
| Start Date: |
4/1/2008
|
Response Authority:
|
OPA
|
Mob Date: |
1/29/2008
|
Response Type:
|
Time-Critical
|
| Demob Date: |
5/23/2008
|
NPL Status:
|
Non NPL
|
| Completion Date: |
3/11/2009
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
Reimbursable Account #
|
|
| FPN# |
E08906
|
|
|
Greka has completed the rehabilitation of the unnamed tributary to Sisquoc Creek along Palmer Road. Erosion control structures were installed through out the creek and area formerly occupied by the Upper Bell Pond.
Greka hired a landscaper and hydroseeded the creek and the area formerly occupied by the Upper Bell Pond. The seed pallet consisted of native grasses and plants. The seed pallet was approved by the California Department of Fish and Game (DFG). OSC Wise has issued a PRFA to DFG to oversee the rehabilitation of the creek.
No further EPA action is required. However, Greka will be required to maintain the hydroseeded areas until the vegetation has reestablished itself. This will be overseen by DFG. The PRFA will remain open for approximately 6 months.
The Order will be terminated.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor - Including Pending Cost |
$1,300,000.00 |
$1,221,478.00 |
$78,522.00 |
6.04% |
| PST |
$50,000.00 |
$35,000.00 |
$15,000.00 |
30.00% |
| RST/START |
$224,160.00 |
$84,716.00 |
$139,444.00 |
62.21% |
| PRFA (DFG) |
$25,000.00 |
$0.00 |
$25,000.00 |
100.00% |
|
Intramural Costs
|
| USEPA - Direct |
$75,000.00 |
$62,000.00 |
$13,000.00 |
17.33% |
| |
| Total Site Costs |
$1,674,160.00 |
$1,403,194.00 |
$270,966.00 |
16.19% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/Greka_Bell_3
POLREP #13 Last Updated 3/17/2009
|