POLLUTION REPORT
|
| Date: |
Monday, December 30, 2002
|
| From: |
Steven Faryan
|
|
Subject:
|
Lockformer
711 Ogden Avenue,
Lisle, IL
Latitude: 41.8017000 Longitude: -88.0625000
|
| POLREP No.: |
4
|
Site #:
|
B5Y5
|
| Reporting Period: |
21 December 2002 to 30 December 2002
|
D.O. #:
|
|
| Start Date: |
|
Response Authority:
|
CERCLA
|
Mob Date: |
7/22/2002
|
Response Type:
|
|
| Demob Date: |
|
NPL Status:
|
|
| Completion Date: |
|
Incident Category:
|
Removal Assessment
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
|
|
U.S. EPA OSC Steve Faryan and Weston Solutions Inc. (WSI) START personal, Ben Maradkel continue conducting oversight, while PRP contractor installs soil vapor extraction (SVE) wells.
■ Installation of eleven soil vapor extraction (SVE) wells.
■ Reinforced haul road south of the Lockformer plant with more gravel to reduce tracking of mud on to the streets.
■ Transported and Disposed soil cuttings off-site.
■ Cut concrete inside the plant (west portion) to install SVE wells and electrodes.
|
|
■ PRP will remediate the surficial silty clay till and fill in Area 1 and 2 with Electrical Resistive Heating (ERH) technology.
■ PRP will remediate the mass waste sand and gravel in Area 1 and 2 with SVE technology.
|
|
■ Continue to install SVE wells.
■ Solve run-off problem in temporary parking lot (TBD e.g. catch basin)
■ Cut into concrete floor inside plant (former degreaser area).
■ Install equipment and process piping to the SVE wells.
■ Construct storage building.
■ Install electrodes and vapor wells for ERH.
■ Hookup vapor/air/water piping (ERH).
■ Review and Approve confirmation sampling plan.
■ Transport and Dispose soil cuttings and decontamination water off-site.
|
response.epa.gov/lockformer
|