Personnel On-Scene: 02/09/09 EPA-1, START-1, ERRS-8, PADEP-0, Others-0 02/10/09 EPA-1, START-1, ERRS-8, PADEP-2, Others-0 02/11/09 EPA-1, START-1, ERRS-8, PADEP-0, Others-0 02/12/09 EPA-1, START-1, ERRS-8, PADEP-1, Others-0 02/13/09 EPA-1, START-1, ERRS-8, PADEP-0, Others-0
Weather: 02/09/09 Low of 19° F, high of 41° F, partly cloudy, 0.00” precipitation, wind 0-8 mph. 02/10/09 Low of 32° F, high of 52° F, mostly cloudy, 0.25” precipitation, wind 1-9 mph 02/11/09 Low of 48° F, high of 65° F, mostly cloudy, 0.26” precipitation, wind 6-24 mph 02/1209 Low of 32° F, high of 46° F, partly cloudy, 0.11” precipitation, wind 20-37 mph 02/13/09 Low of 29° F, high of 34° F, partly cloudy, 0.00” precipitation, wind 11-14 mph
02/09/09 Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental Services, Inc. held its morning safety meeting and discussed the days planned activities.
ERRS continued cleanup activities of the large debris piles located on the south side of building 9. The debris piles consist of large pieces of metal scrap, and large concrete chunks with rebar protruding from them and are mixed with arsenic and lead contaminated dirt and other fines. ERRS workers cut the scrap metal down to a transportable size and broke up the concrete, removing the rebar, and then cut the rebar to a suitable length for transporting. The metal was taken to a scrap yard for recycling. The concrete was staged in the same location as the concrete debris from the burn area which is south of the electrical substation and across the road.
START provided the OSC with technical and administrative assistance, conducted contractor monitoring, and written and photographic documentation.
02/10/09 Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental Services, Inc. held its morning safety meeting and discussed the days planned activities.
ERRS continued cleanup activities of the large debris piles located on the south side of building 9. ERRS workers cut the scrap metal down to a transportable size. The concrete chunks were busted up using a backhoe and rebar was removed. The rebar was cut to a suitable length for transporting. A sifting device was used to separate the dirt and other fines from the larger concrete debris. These fines contained arsenic and lead and were staged separately.
OSC Downie met with Lawrence County Representatives to update them on status of site.
START provided the OSC with technical and administrative assistance, conducted contractor monitoring, and written and photographic documentation.
Pennsylvania Department of Environmental Protection (PADEP) representatives Mary Hoffman and Kevin Jordan mobilized to site to assist with oversight.
02/11/09 Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental Services, Inc. held its morning safety meeting and discussed the days planned activities.
ERRS continued cleanup activities of the large debris piles located on the south side of building 9. ERRS continued to reduce the size profile and segregate the metal, concrete, fines and debris. The concrete chunks were busted up using a backhoe. The fines which contain arsenic and lead were staged separately. ERRS purchased and spread gravel around the work trailer area to help alleviate mud being tracked into the work trailer.
Flynns Tire Repair Service was onsite today to repair the tire on the skid loader being used at the site.
START provided the OSC with technical and administrative assistance, conducted contractor monitoring, and written and photographic documentation.
02/12/09 Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental Services, Inc. held its morning safety meeting and discussed the days planned activities.
ERRS continued cleanup activities of the large debris piles located on the south side of building 9.
START provided the OSC with technical and administrative assistance, conducted contractor monitoring, and written and photographic documentation.
Pennsylvania Department of Environmental Protection (PADEP) representative Mary Hoffman mobilized to site to assist with oversight.
02/13/09 Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental Services, Inc. held its morning safety meeting and discussed the days planned activities.
ERRS continued cleanup activities of the large debris piles located on the south side of building 9.
START provided the OSC with technical and administrative assistance, conducted contractor monitoring, and written and photographic documentation.
02/14/09 ERRS demobed from site.
|