Date:
Wednesday, April 29, 2009
From:
Adam Adams

To:
Peter Ricca, LDEQ
Debbie Dietrich, EPA

Subject: 

Excavation
Kriger Battery
7179 Adams Lane, Greenwood, LA
Latitude: 32.4374800
Longitude: -93.9434900


POLREP No.:
2
Site #:
06TH
Reporting Period:
2nd week of Removal Operation
D.O. #:
Start Date:
4/14/2009
Response Authority:
CERCLA
Mob Date:
4/13/2009
Response Type:
Time-Critical
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
LA0000605270
Contract #
EP-W-06-042
RCRIS ID #:
 

Site Description

The Kriger Battery removal site is located in Greenwood, Caddo Parish, Lousisana on commercial/industrial zoned property.  The site is a former battery reclamation facility that operated between 1972 and 1982 and consisted of a processing building, acid neutralization pit, and hammer mill area.  Historical sampling conducted by the Louisiana Department of Environmental Quality (LDEQ)shows on-site lead concentrations as high as 112,660 mg/kg.  Elevated lead concentrations have been located off-site on adjoining properties and drainage paths.  


Current Activities

Excavation of grids continues.  To date, 13 off-site grids and 19 on-site grids have been excavated.  Of the 32 grids excavated, only 1 on-site grid measures lead at a level above the cleanup level.  

The 5 residential off-site grids to the west of the site have been backfilled and restored to completion.

Excavated soils have been stockpiled and sampled for waste profile characterization.


Planned Removal Actions

An Availability Session will be held the evening of May 4, 2009 fom 6:30 p.m. to 9:00 p.m. for all persons interested in Kriger Battery Removal Site activities or having any relative unanswered questions about this removal action.

Location:  Pioneer Community Building
6798 Howell Street, Greenwood,  LA  71033


Next Steps

Continue excavation of grids from east to west, confirmation sampling will be conducted following verification of grids by XRF lead analysis, and profiled soils will be transported for off-site disposition.


Estimated Costs *
  Budgeted Total To Date Remaining % Remaining
Extramural Costs
Intramural Costs
 
Total Site Costs $0.00 $0.00 $0.00 0.00%

* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.


response.epa.gov/kriger_battery