1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
015P |
|
Contract Number: |
EP-W-08061 |
D.O. Number: |
001 |
|
Action Memo Date: |
8/8/2008 |
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
9/17/2008 |
|
Start Date: |
9/17/2008 |
Demob Date: |
5/15/2009 |
|
Completion Date: |
5/15/2009 |
CERCLIS ID: |
MAD000034215 |
|
RCRIS ID: |
MAD000034215 |
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Time critical removal action
1.1.2 Site Description
The Old Bondsville Factory Site is the location of a former textile mill located in Palmer and Belchertown, Massachusetts. Covering about 12 acres, the Site is bordered to the north and west by residential properties, to the east by a dam across the Swift River, and to the south by Main Street in Palmer and Depot Street in Belchertown.
During an April 2008 Targeted Brownfields Assessment, EPA’s Brownfields program found high levels of lead and arsenic in surface soils and referred the Site to the Emergency Planning and Response Branch (EPRB) in May 2008. EPA conducted a removal site investigation on July 8-11, 2008 which confirmed the presence of high levels of arsenic and lead in surface soils. The site investigation was closed on July 25, 2008 with the recommendation that a time critical removal action be conducted. See polrep 1 for additional site background information.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Response Actions to Date
See previous polreps for removal activities conducted prior to April 27, 2009.
During the week of April 27 through May 1, 2009, EPA and its contractors completed backfilling the excavated areas with clean fill. Disturbed areas were then loamed and seeded.
On May 15, 2009, EPA and the ERRS contractor applied additional grass seed and erosion matting to address areas of potential erosion and then demobilized.
2.1.4 Progress Metrics
Between October 2008 and January 2009, 136 grids of contaminated surface soils were excavated, generating 2,344 tons of contaminated soils.
|
|
2.2 Planning Section
|
|
|
2.2.1 Planned Response Activities
The removal action is complete. No further response activities are planned.
|
|
2.3 Logistics Section
|
|
|
N/A
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
2.5.1 Safety Officer N/A
2.6 Liaison Officer N/A
2.7 Information Officer 2.7.1 Public Information Officer
EPA attended a televised public meeting with the Town of Palmer on September 8, 2008. EPA's Public Information Officer also distributed a fact sheet to local residents in September 2008 to provide information about the cleanup.
|
3. Participating Entities
|
|
3.1 Unified Command N/A
3.2 Cooperating Agencies EPA has coordinated closely with MassDEP throughout this project.
|
4. Personnel On Site
|
|
N/A
|
5. Definition of Terms
|
|
ERRS = Emergency Rapid Response Services START = Superfund Technical Assessment and Response Team
|
6. Additional sources of information
|
|
6.1 Internet location of additional information/report For additional information please refer to http://epaosc.net/bondsville.
6.2 Reporting Schedule N/A
|
7. Situational Reference Materials
|
|
The Administrative Record for this removal action can be reviewed at EPA's office in Boston or at the Palmer Public Library.
|