United States Environmental Protection Agency
Region VI
POLLUTION REPORT



Date:
Thursday, May 28, 2009
From:
Adam Adams

Subject: 

Continued Treatment of Excavated Soil
Kriger Battery
7179 Adams Lane, Greenwood, LA
Latitude: 32.4374800
Longitude: -93.9434900


POLREP No.:
6
Site #:
06TH
Reporting Period:
5/17/2009-5/23/2009
D.O. #:
Start Date:
4/14/2009
Response Authority:
CERCLA
Mob Date:
4/13/2009
Response Type:
Time-Critical
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
LA0000605270
Contract #
EP-W-06-042
RCRIS ID #:
 

Site Description

The Kriger Battery removal site is located in Greenwood, Caddo Parish, Lousisana on commercial/industrial zoned property.  The site is a former battery reclamation facility that operated between 1972 and 1982 and consisted of a processing building, acid neutralization pit, and hammer mill area.  Historical sampling conducted by the Louisiana Department of Environmental Quality (LDEQ)shows on-site lead concentrations as high as 112,660 mg/kg.  Elevated lead concentrations have been located off-site on adjoining properties and drainage paths.  


Current Activities

The treatment of previously excavated soils using a specialized chemical application continued during the reporting period.  As of the end of the reporting period treatment operations have resulted in 1,136 cubic yards of treated excavated soil.


Planned Removal Actions

Continue excavated soil treatment operations.


Next Steps

Transportation and disposal of waste generated from treatment operations will commence upon receipt of supporting non-hazardous analytical results.


response.epa.gov/kriger_battery