|
United
States Environmental Protection Agency
Region IV
POLLUTION REPORT
|
| Date: |
Thursday, May 28, 2009
|
| From: |
Chris Russell
|
|
Subject:
|
Initial POLREP
Golden Peanut Sodium Hydroxide Spill
805 East Newton Street,
Dothan, AL
Latitude: 31.2289620 Longitude: -85.3846210
|
| POLREP No.: |
1
|
Site #:
|
|
| Reporting Period: |
05/28/09 - 05/28/2009
|
D.O. #:
|
|
| Start Date: |
5/28/2009
|
Response Authority:
|
CERCLA
|
Mob Date: |
5/28/2009
|
Response Type:
|
Emergency
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Assessment
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
|
|
During the morning of May 28th, 2009, representatives of the Golden Peanut Company discovered that an above ground storage tank containing sodium hydroxide had been vandalized and approximately 5,000 gallons of sodium hydroxide was released into the environment. The majority of the product was released into the soil, with some of the free product entering a local storm drain system. Local fire hazmat, EMA, and police responded to the scene. Due to another ongoing environmental emergency, ADEM emergency response personnel were unable to respond to the scene on the 28th. OSC Russell was dispatched to the scene by the EPA Region 4 Telephone Duty Officer. Golden Peanut Company obtained the services of an environmental cleanup contractor to mitigate the release.
|
|
Golden Peanut Company has hired an environmental response cleanup contractor to mitigate the release. The initial assessment indicates that the majority of the product has released into the soil, as well as into a nearby storm drain. The cleanup contractor has begun removing the contaminated soil.
Due to incomplete information pertaining to the storm drain system, a complete assessment of the drain system has not been conducted.
|
|
Contaminated soil will continue to be removed. After the storm drain system is adequately assessed, a determination of removal actions pertaining to the storm drain will be made.
|
|
Adequately assess the storm drain system to determine the extent of contamination. Continue to remove and properly dispose of the contaminated soil. Coordinate with ADEM personnel on-site concerning mitigation activities.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
|
Intramural Costs
|
| |
| Total Site Costs |
$0.00 |
$0.00 |
$0.00 |
0.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/GoldenPeanutSodiumHydroxideSpill
POLREP #1 Last Updated 6/2/2009
|