United
States Environmental Protection Agency
Region VI
POLLUTION REPORT
|
| Date: |
Tuesday, June 2, 2009
|
| From: |
Adam Adams
|
| To: |
Peter Ricca, LDEQ
|
Debbie Dietrich, EPA
|
|
Subject:
|
Continued Treatment of Excavated Waste
Kriger Battery
7179 Adams Lane,
Greenwood, LA
Latitude: 32.4374800 Longitude: -93.9434900
|
| POLREP No.: |
7
|
Site #:
|
06TH
|
| Reporting Period: |
5/24/09-5/30/09
|
D.O. #:
|
|
| Start Date: |
4/14/2009
|
Response Authority:
|
CERCLA
|
Mob Date: |
4/13/2009
|
Response Type:
|
Time-Critical
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
LA0000605270
|
Contract #
|
EP-W-06-042
|
| RCRIS ID #: |
|
|
|
The Kriger Battery removal site is located in Greenwood, Caddo Parish, Lousisana on commercial/industrial zoned property. The site is a former battery reclamation facility that operated between 1972 and 1982 and consisted of a processing building, acid neutralization pit, and hammer mill area. Historical sampling conducted by the Louisiana Department of Environmental Quality (LDEQ)shows on-site lead concentrations as high as 112,660 mg/kg. Elevated lead concentrations have been located off-site on adjoining properties and drainage paths.
|
|
The treatment of previously excavated soils using a specialized chemical application continued during the reporting period. As of the end of the reporting period treatment operations have resulted in 1,349 cubic yards of treated excavated soil. The treatment of all soils excavated to date is complete.
|
|
Commence excavations of grids on the western portion of the site beginning on the south.
|
|
Transportation and disposal of waste generated from treatment operations will commence upon receipt of supporting non-hazardous analytical results.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
|
Intramural Costs
|
| |
| Total Site Costs |
$0.00 |
$0.00 |
$0.00 |
0.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/kriger_battery