United
States Environmental Protection Agency
Region I
POLLUTION REPORT
|
| Date: |
Wednesday, June 17, 2009
|
| From: |
Catherine Young, OSC
|
| To: |
Catherine Young, EPA
|
Maureen Bagocius, USEPA Region 1
|
|
Lisa Boynton, EPA HQ - Emergency Response Division
|
John Carlson, EPA Region 1 - OSRR
|
|
Rich Cavagnero, EPA Region 1 - OSRR
|
Dave Deegan, EPA Region 1
|
|
Filomena DiNardo, EPA Region 1 - OSRR
|
Lynne Galvin, EPA Region 1 - OSRR
|
|
Nancy Grantham, EPA Region 1
|
Stacy Greendlinger, EPA Region 1
|
|
Tim Grier, EPA HQ - Emergency Response Division
|
Brenda Haslett, EPA Region 1
|
|
Tina Hennessy, EPA Region 1 - EPRB
|
Arthur Johnson, EPA Region 1 - EPRB
|
|
Sheila Kelly, EPA HQ - Emergency Response Division
|
Ira Leighton, EPA Region 1
|
|
Patti Ludwig, EPA Region 1
|
Dave McIntyre, EPA Region 1 - EPRB
|
|
MaryJane O'Donnell, EPA Region 1 - OSRR
|
James Owens, EPA Region 1 - OSRR
|
|
Superfund Records Center, EPA Region 1
|
Art Wing, EPA Region 1 - OSRR
|
|
Subject:
|
St. John's Cemetery Site Update
St. Johns Cemetery
500 Moose Hill Road,
Monroe, CT
Latitude: 41.3233000 Longitude: -73.2019000
|
| POLREP No.: |
3
|
Site #:
|
01FI
|
| Reporting Period: |
|
D.O. #:
|
|
| Start Date: |
12/2/2008
|
Response Authority:
|
CERCLA
|
Mob Date: |
12/2/2008
|
Response Type:
|
Time-Critical
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
CTN000105902
|
Contract #
|
|
| RCRIS ID #: |
|
|
|
A magnetometer survey was conducted in a limited area around the location where drums were discovered during the week of March 23, 2009 to determine potential locations of additional drums. The magnetometer survey detected only one anomaly for buried metal, which was determined during excavation to be miscellaneous, small pieces of metal.
During the week April 13, 2009, subsurface sampling was conducted within the area of the magnetometer survey to assess extent of PCB contamination. No PCB's were detected from the subsurface samples. Samples were analyzed using the EPA Region 1 mobile laboratory.
EPA mobilized to the site during the week of May 4, 2009 to commence excavation activities within the area where drums were previously discovered and sent for disposal. Site preparation included the removal of trees location within the area of contamination. The EPA Region I Mobile Lab was on site for post-excavation sampling to ensure the removal of contaminated soils.
Contaminated soils have been excavated and sent for disposal during the week of June 8, 2009.
Final activities include backfilling and site restoration.
|
|
Site activities are scheduled for completion during the week of June 22, 2009.
|
|
The site is located within a cemetery with unrestricted access to the public.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$650,000.00 |
$266,156.00 |
$383,844.00 |
59.05% |
|
Intramural Costs
|
| |
| Total Site Costs |
$650,000.00 |
$266,156.00 |
$383,844.00 |
59.05% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/stjohnscemetery
POLREP #3 Last Updated 9/9/2009
|