POLLUTION REPORT



Date:
Monday, June 22, 2009
From:
Adam Adams

To:
Peter Ricca, LDEQ
Debbie Dietrich, EPA

Subject: 

Initiation of LDEQ-Sponsored Removal Actions
Kriger Battery
7179 Adams Lane, Greenwood, LA
Latitude: 32.4374800
Longitude: -93.9434900


POLREP No.:
10
Site #:
06TH
Reporting Period:
6/14/2009-6/20/2009
D.O. #:
Start Date:
4/14/2009
Response Authority:
CERCLA
Mob Date:
4/13/2009
Response Type:
Time-Critical
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
LA0000605270
Contract #
EP-W-06-042
RCRIS ID #:
 

Site Description

The Kriger Battery removal site is located in Greenwood, Caddo Parish, Louisiana on commercial/industrial zoned property.  The site is a former battery reclamation facility that operated between 1972 and 1982 and consisted of a processing building, acid neutralization pit, and hammer mill area.  Historical sampling conducted by the Louisiana Department of Environmental Quality (LDEQ)shows on-site lead concentrations as high as 112,660 mg/kg.  Elevated lead concentrations have been located off-site on adjoining properties and drainage paths.  


Current Activities

EPA Removal:
Excavations of EPA designated grids were completed on June 20.  All treatment of excavated soils were completed on site, bringing the total of EPA waste generated to approximately 2,273.41 cubic yards.  All of the approximate 900 cubic yards of EPA treated waste remaining on site is treated, stockpiled, and ready for transportation and disposal.  Construction of a haul road from the pad to the eastern side of the site was initiated to facilitate backfilling operations.

LDEQ Removal:
LDEQ sponsored removal actions were initiated.  This included excavations on the site's eastern portion, accounting for approximately 260 cubic yards of excavated soils.  Excavated soils were staged in an intermediate stockpile in anticipation of transferring to the site's western area adjacent to the pad for treatment.  A waste profile was initiated for LDEQ designated soils by sampling of the respective soils before treatment and after treatment.


Planned Removal Actions

EPA Removal:  Complete second and final round of transportation and disposal of remaining EPA generated waste.

LDEQ Removal:  Continue excavation of LDEQ sponsored grids on the eastern portion of the site.  Stockpile excavated soils prior to treatment, sampling, and transportation and disposal.


Next Steps

EPA removal:  Complete all EPA removal action minus restoration by July 1, 2009.


Key Issues

LDEQ signed the Removal Action Contract on June 11, 2009 to conduct further removal action beyond the EPA scope of work.


Estimated Costs *
  Budgeted Total To Date Remaining % Remaining
Extramural Costs
Intramural Costs
 
Total Site Costs $0.00 $0.00 $0.00 0.00%

* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.


response.epa.gov/kriger_battery

POLREP #10 Last Updated 8/18/2009