POLLUTION REPORT
|
| Date: |
Monday, June 22, 2009
|
| From: |
Adam Adams
|
| To: |
Peter Ricca, LDEQ
|
Debbie Dietrich, EPA
|
|
Subject:
|
Initiation of LDEQ-Sponsored Removal Actions
Kriger Battery
7179 Adams Lane,
Greenwood, LA
Latitude: 32.4374800 Longitude: -93.9434900
|
| POLREP No.: |
10
|
Site #:
|
06TH
|
| Reporting Period: |
6/14/2009-6/20/2009
|
D.O. #:
|
|
| Start Date: |
4/14/2009
|
Response Authority:
|
CERCLA
|
Mob Date: |
4/13/2009
|
Response Type:
|
Time-Critical
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
LA0000605270
|
Contract #
|
EP-W-06-042
|
| RCRIS ID #: |
|
|
|
The Kriger Battery removal site is located in Greenwood, Caddo Parish, Louisiana on commercial/industrial zoned property. The site is a former battery reclamation facility that operated between 1972 and 1982 and consisted of a processing building, acid neutralization pit, and hammer mill area. Historical sampling conducted by the Louisiana Department of Environmental Quality (LDEQ)shows on-site lead concentrations as high as 112,660 mg/kg. Elevated lead concentrations have been located off-site on adjoining properties and drainage paths.
|
|
EPA Removal: Excavations of EPA designated grids were completed on June 20. All treatment of excavated soils were completed on site, bringing the total of EPA waste generated to approximately 2,273.41 cubic yards. All of the approximate 900 cubic yards of EPA treated waste remaining on site is treated, stockpiled, and ready for transportation and disposal. Construction of a haul road from the pad to the eastern side of the site was initiated to facilitate backfilling operations.
LDEQ Removal: LDEQ sponsored removal actions were initiated. This included excavations on the site's eastern portion, accounting for approximately 260 cubic yards of excavated soils. Excavated soils were staged in an intermediate stockpile in anticipation of transferring to the site's western area adjacent to the pad for treatment. A waste profile was initiated for LDEQ designated soils by sampling of the respective soils before treatment and after treatment.
|
|
EPA Removal: Complete second and final round of transportation and disposal of remaining EPA generated waste.
LDEQ Removal: Continue excavation of LDEQ sponsored grids on the eastern portion of the site. Stockpile excavated soils prior to treatment, sampling, and transportation and disposal.
|
|
EPA removal: Complete all EPA removal action minus restoration by July 1, 2009.
|
|
LDEQ signed the Removal Action Contract on June 11, 2009 to conduct further removal action beyond the EPA scope of work.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
|
Intramural Costs
|
| |
| Total Site Costs |
$0.00 |
$0.00 |
$0.00 |
0.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/kriger_battery