POLLUTION REPORT



Date:
Thursday, June 25, 2009
From:
Leonardo Ceron

Subject: 

Site Mobilization
Goodyear Dump Site
556 Buffalo Hollow, Berea, KY
Latitude: 37.5272000
Longitude: -84.3367000


POLREP No.:
2
Site #:
A4LP
Reporting Period:
06/22-25/09
D.O. #:
Start Date:
6/23/2009
Response Authority:
CERCLA
Mob Date:
6/22/2009
Response Type:
Time-Critical
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
KYN000409853
Contract #
RCRIS ID #:
 

Site Description





See Pol Rep #1




Current Activities

ERRS and START Contractors have mobilized to Berea Kentucky and the Goodyear Site.

Fund lead removal operations have begun at Site.  Excavation is expected to last three to four weeks with disposal to occur within two months of this date.  Initial conditions on Site are favorable for expedited dig and haul operations, which suggest that the time tables for this removal are expected to improve.  The State of Kentucky’s Department of Environmental Protection (KDEP) has approved the proposed back fill material and has maintained a presence on Site for most of initial project period.

START contractors have completed the following: installed perimeter monitoring using DataRam particulate monitors; and grid locations have been marked for excavation using GPS instrumentation; photo documentation has been collected at Site and all minor roads leading to Site. Initial excavation will begin with grids D2, D5 and I11, J11 confirmatory samples will be taken of all grids excavated.  

ERRS contractors have mobilized excavating equipment; gravel has been placed throughout the main road at the Site.  

KYDEP has participated in most activities on site to date and is expected to continue their presence on Site throughout the removal


Planned Removal Actions

Initial excavation is planned for grids D2, i11, j11 and g14, the rmaining grids will follow accordingly.  One of the the residential homes on Site may require temporary relocation as a septic system's drainage field may need to be excavated.


Next Steps

Excavation of remaining grids and further identification by KDEP of areas which may contain additional contamination.  Confirmatory sampling of all excavated girds. Clean fill will be stockplied begining the week of June 28th.


Key Issues

KYDEP and EPA will continue to coordinate removal operations to meet both EPA and State environmental limits