U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Southern Iowa Mechanical Site - Removal Polrep
Initial Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region VII

Subject: POLREP #1
Pollution Report (Initial) #1
Southern Iowa Mechanical Site
A7K9
Ottumwa, IA
Latitude: 41.0695830 Longitude: -92.4011970


To:
From: DeAndré Singletary, RPM
Date: 7/12/2009
Reporting Period: 6/22/2009 - 7/02/2009

1. Introduction
  1.1 Background
   
Site Number: A7K9    Contract Number: N/A
D.O. Number: N/A    Action Memo Date: 12/30/2008
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: PRP    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit: 00
Mobilization Date: 6/22/2009    Start Date: 6/22/2009
Demob Date:      Completion Date:  
CERCLIS ID: IAN000705908    RCRIS ID: N/A
ERNS No.: N/A    State Notification: N/A
FPN#: N/A    Reimbursable Account #: N/A




2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

Weather during the reporting period was hot and sunny with temperatures reaching mid to upper 90s.   Greenleaf Environmental Services LLC (Greenleaf), the potentially responsible party's (PRP's) contractor, performed mobilization activities the week of June 22.  These activities included constructing a gravel access road and parking lot, equipment delivery, decontamination tent construction, office trailer set up, and utility hookup.  Beam segregation to separate beams with PCB-containing residual insulation or adhesive was initiated toward the end of the week of the June 22 and is on-going.  Per the approved workplan, beams from the site's stockpiles were visually inspected for residual insulation or adhesive.  As of July 2, 2009, 346 steel beams were separated from the most northern stockpile and visually inspected.  A visual inspection revealed that 61 of the metal beams appeared to contain no residual insulation or adhesives.  The remaining 285 metal beams contained visible residual insulation or adhesive and were relocated to the decontamination staging area for subsequent removal of the material.  Actual decontamination procedures have not been initiated.  

2.1.2 Response Actions to Date

The only previous action taken at the SIM site with respect to the beams is the installation of a temporary fence to restrict access to the beams. The fence was installed by the property owner at EPA's request in July 2008.

The Iowa Department of Natural Resources (IDNR) provided a list of Applicable or Relevant and Appropriate Requirements (ARARs) for consideration for the response action.   No other state activities have occurred. 


2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

The PRP has been identified as Dico, Inc. and its parent company Titan Tire Corp.  The PRPs were issued an Administrative Settlement Agreement and Order on Consent to perform the response action.  The opportunity to negotiate was waived.  PRPs are currently under a Unilateral Administrative Order (UAO) to perform response activities proposed in the Action Memorandum.

2.1.4 Progress Metrics


 

Wastestream

 

Medium

 

Quantity



Manifest #

 

Treatment

 

Disposal

 PCBs

 Steel Beams 

285 

 

 0

 0

 PCBs    

 Soil

 ?

 

 0

 0

 PCBs    

 Bulk Insulation

 ?

 

 

 



  2.2 Planning Section
   

2.2.1 Anticipated Activities

2.2.1.1 Planned Response Activities

An action memorandum was  prepared and issued December 30, 2008.  The proposed action consists of decontaminating the beams by removing the PCB residues by scarification. The beams would be decontaminated to meet the Visual Standard No. 2, Near-White Blast Cleaned Surface Finish, of the National Association of Corrosion Engineers (NACE), as called for by 40 CFR 761.79(b)(3)(B).  This standard applies to "non-porous surfaces in contact with nonliquid PCBs (including non-porous surfaces covered with a porous surface, such as paint or coating on metal)."  The beams are a nonporous surface in contact with nonliquid PCBs (insulation and adhesive residue) and the beams are coated with paint. Following scarification, the cleaned beams would then be available for reuse.  Decontamination waste including the scarifying agent would be containerized and transported off-site for disposal in accordance with applicable TSCA regulations.  Soil beneath the area where the beams have been stored would be sampled using a statistical sampling scheme to verify that appropriate cleanup levels are achieved.  Any areas exceeding cleanup levels would be excavated and transported off-site for disposal in accordance with 40 CFR 761.61. 

2.2.1.2 Next Steps

Beam segregation to separate beams with PCB-containing residual insulation or adhesive is expected to continue.  Scarification procedures are also expected to be initiated.  A sampling event is scheduled for July 20 and 21 to provide confirmation for beams that have been visually inspected and appear to contain no residual insulation or adhesive.

2.2.2 Issues

Greenleaf's supply trailer was discovered stolen on June 30, 2009.  They have procured personnel to secure the site when response personnel are not present.

  2.3 Logistics Section
    There are currently no logistical concerns.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer
On May 27, 2009, the site health and safety plan was finalized by Greenleaf Environmental.

2.6 Liaison Officer
No activities.

2.7 Information Officer


2.7.1 Public Information Officer

The Administrative Record was fedexed to the Ottumwa Public Library for public availability on June 30, 2009.

2.7.2 Community Involvement Coordinator

No activities.

3. Participating Entities
  3.1 Unified Command
Titan Tire Corp.
Dico Inc.
US EPA

3.2 Cooperating Agencies
None

4. Personnel On Site
  1 EPA RPM
4 Greenleaf Environmental Contractors
1 Titan Tire/DICO Consultant

5. Definition of Terms
  PCBs - polychlorinated biphenyls

6. Additional sources of information
  6.1 Internet location of additional information/report
For additional information please refer to http://epaosc.net/SouthernIowaMechanical.

6.2 Reporting Schedule
The next polrep will be reported on July 20, 2009.