United
States Environmental Protection Agency
Region IV
POLLUTION REPORT
|
| Date: |
Tuesday, September 29, 2009
|
| From: |
Dean Ullock, On-Scene Coordinator
|
| To: |
Grady Springer, ADEM-Montgomery
|
Matt Taylor, USEPA R4 ERRB
|
|
Subject:
|
INITIAL
CARMICHAEL ROAD WASTE OIL DUMP SITE
MONTGOMERY, AL
Latitude: 32.3667000 Longitude: -86.3002000
|
| POLREP No.: |
1
|
Site #:
|
B434
|
| Reporting Period: |
09/25/2009
|
D.O. #:
|
|
| Start Date: |
9/25/2009
|
Response Authority:
|
CERCLA
|
Mob Date: |
9/25/2009
|
Response Type:
|
Emergency
|
| Demob Date: |
9/25/2009
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
|
|
The Site is located along Carmichael Road located in East Montgomery, Alabama. The unsecured, uninhabited and undeveloped Site is situated alongside Interstate 85 North, in a moderately populated area surrounded by a mix of commercial and residential development. The There is a cell phone tower located at the top of hill at approximately 304’.
LAT: N 32 21. 651’ LONG: W 086 13. 534’
|
|
EPA and EPA’s contractors (USES) have effectively completed emergency removal actions on September 25, 2009. Approximately 23-25 cu. yards of contaminated soil has been recovered and is being temporarily stored on-site in a covered roll-off box. Waste profile and confirmation sample results are pending. The ADEM officials have been engaged and will be kept informed throughout EPA’s actions.
|
|
Awaiting analytical results.
|
|
Disposal of 23-25 cu. yrds. of waste oil contaminated soil to an approved landfill.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$15,000.00 |
$2,500.00 |
$12,500.00 |
83.33% |
|
Intramural Costs
|
| |
| Total Site Costs |
$15,000.00 |
$2,500.00 |
$12,500.00 |
83.33% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/CARMICHAELROADWASTEOILDUMPSITE
POLREP #1 Last Updated 10/5/2009
|