Friday, October 23, 2009
|
| From: |
Robert Kelly, OSC
|
|
Subject:
|
PRP Removal Activities
Old Athens Turnpike Lead Site
Old Athens Road,
Princeton, WV
Latitude: 37.3729885 Longitude: -81.0771334
|
| POLREP No.: |
5
|
Site #:
|
|
| Reporting Period: |
09/12/09 to 10/23/09
|
D.O. #:
|
|
| Start Date: |
|
Response Authority:
|
CERCLA
|
Mob Date: |
|
Response Type:
|
PRP Oversight
|
| Demob Date: |
|
NPL Status:
|
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
WVN000306554
|
Contract #
|
|
| RCRIS ID #: |
|
|
|
Refer to previous Polreps.
|
|
Analytical results for previous sampling by the Contractors for the PRP indicated that the horizontal extent of the lead contamination had not been fully delineated. Prior to commencing excavation activities, the PRP contractors conducted additional sampling and XRF screening to complete the delineation of the area to be excavated.
Approximately 400 cubic yards of lead-impacted soil and battery casing debris was excavated and transported off site for disposal as hazardous waste. The excavated waste was transported to the Max Environmental Technologies, Inc. facility for disposal.
Confirmation sampling was delayed due to significant amounts of rainfall.
|
|
Confirmation sampling is scheduled to be conducted on October 27, 2009. Excavated grids will be backfilled with clean fill dirt after analytical results for confirmation samples are received if the clean up goal of 400 mg/kg lead is achieved
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
|
Intramural Costs
|
| |
| Total Site Costs |
$0.00 |
$0.00 |
$0.00 |
0.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/athens