POLLUTION REPORT
|
| Date: |
Thursday, November 12, 2009
|
| From: |
Charlie Fitzsimmons, OSC
|
| To: |
Charlie Fitzsimmons, Region III, OPR
|
Linda Marzulli, Region III, OPR
|
|
Subject:
|
Continuation of work
Sykesville Oil Spill
580 Obrect Rd,
Sykesville, MD
Latitude: 39.3839000 Longitude: -76.9783000
|
| POLREP No.: |
50
|
Site #:
|
E043Z1
|
| Reporting Period: |
|
D.O. #:
|
|
| Start Date: |
|
Response Authority:
|
OPA
|
Mob Date: |
|
Response Type:
|
Time-Critical
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
Reimbursable Account #
|
|
| FPN# |
E043Z1
|
|
|
During this reporting period approximately 12 gals of oil and 44 gals of contaminated water were retrieved. The new updated totals are now as of Oct 31, 2009: 4,550 gals of oil and 51,945 gals of contaminated water retrieved.
No problems were encountered during this reporting period.
|
|
A full scale fluid recovery event will be conducted during the month at Sump D, as this sump had a detectable thickness of free product during the prior month’s monitoring that measured 0.08 feet thick. Subsequent measurement of product in Sumps A, B, C, D, V or X and large rain events occurring during the month will also receive scrutiny for additional full scale extraction events.
Additionally, we will continue to monitor free-product from the wells at the Facility periodically each week and any free-product accumulating in the wells will be removed on a daily basis.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| PRFA |
$640,000.00 |
$587,857.00 |
$52,143.00 |
8.15% |
|
Intramural Costs
|
| USEPA - Direct (Region, HQ) |
$30,000.00 |
$28,500.00 |
$1,500.00 |
5.00% |
| |
| Total Site Costs |
$670,000.00 |
$616,357.00 |
$53,643.00 |
8.01% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/sykesvilleoil
POLREP #50 Last Updated 11/12/2009
|