Site Number: |
JWKER004 |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
|
Response Authority: |
CERCLA |
|
Response Type: |
Emergency |
Response Lead: |
EPA |
|
Incident Category: |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
12/12/2009 |
|
Start Date: |
12/12/2009 |
Demob Date: |
12/13/2009 |
|
Completion Date: |
12/13/2009 |
CERCLIS ID: |
|
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Emergency Response
1.1.2 Site Description
On December 12, 2009, US EPA was notified that an American Electric Power (AEP) transformer was on fire in Coloma, Michigan. Local responders from the Coloma-Hagar Fire Department and AEP reported that the transformer contained 12,000 gallons of mineral oil. They also reported that the fire had subsided somewhat since it began at 1730 EST, but was still forcefully burning. The prevailing winds were out of the south, and residents along Wilson Road, north of the transformer, were advised to voluntarily evacuate or shelter in place. The Coloma-Hagar Fire Department estimated that the transformer would remain on fire for up to three days if there was no attempt to extinguish it.
1.1.2.1 Location
Coloma, Berrien County, MI
1.1.2.2 Description of Threat
The smoke plume from the transformer fire could contain VOCs, CO, and particulates at levels dangerous to nearby residents.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
|
|
|
2.1.1 Narrative
OSC Jeff Kimble and WESTON START representatives Jay Rauh, Shauna Ross, and Jeff Bryniarski met in Coloma at 0220 EST on December 13, 2009. OSC Kimble directed STARTs to place four Area-rae air monitoring instruments in the likely path of the smoke plume and near potentially affected residences. OSC Kimble asked START to continue monitoring the perimeter until the fire was out. He also instructed START to relocate monitors if the wind direction changed. The pertinent monitoring parameters were volatile organic carbons (VOC), carbon monoxide (CO), and particulates. The four area rae monitors were used to monitor VOC and CO. They were set to log all readings and were placed
- At the intersection of Bundy and Wilson (NW of the transformer)
- On Wilson where the electrical lines intersected Wilson (N of the transformer)
- Near a residential driveway at 5206 Wilson (NE of the transformer)
- Near the intersection of Riverside and Clymer (N of the transformer)
A personal data ram (PDR) was used to monitor for particulates, and the PDR was driven to the monitoring locations to collect readings.
By 0700, air monitoring did not indicate readings significantly elevated above background readings, and there was a shift in the prevailing wind (east). START relocated two monitors closer to the fire. The monitor from location #1 was moved to the dead end of Randall Road (E-NE of the transformer), and the monitor from location #4 was moved into the grassy field to the east of the burning transformer.
At 1230, START members Lori Kozel and Mike Browning arrived to relieve the initial START responders. After site familiarization, Rauh, Ross, and Bryniarski demobilized from the site.
At 1405, the North Berrian Fire Department extinguished the fire by applying Class A foam and water. The secondary containment surrounding the transformer prevented oil and water runoff. START remained at the site until 1800 to verify that the there were no flare ups, after which they demobilized.
2.1.2 Response Actions to Date
Completed Emergency Response air monitoring support for North Berrien FD.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
AEP is the primary PRP. OSC Kimble discussed EPA's role in air monitoring with AEP's Environmental Services staff (Ms. Jeni Miller), and offered to let AEP assume that role. After brief discussions, both parties agreed EPA would continue the air monitoring until the fire was exstinguished.
Ms. Miller assured OSC Kimble that they would have their contractor, SunPro, complete any cleanup once the fire was out.
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|