United States Environmental Protection Agency
Region IV
POLLUTION REPORT



Date:
Friday, January 22, 2010
From:
Leonardo Ceron, On Scene Coordinator

To:
Jim McGuire, USEPA R4 ERRB
Jim Webster, USEPA R4 ERRB

Subject: 

Removal Action Pending
Powder Springs Road Plating
5491 Austell Power Springs Road, Austell, GA
Latitude: 33.8200496
Longitude: -84.6419656


POLREP No.:
8
Site #:
B443
Reporting Period:
D.O. #:
Start Date:
10/23/2009
Response Authority:
CERCLA
Mob Date:
10/23/2009
Response Type:
Emergency
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
Contract #
RCRIS ID #:
 

Site Description

This chrome-electroplater is located at 5491 Powder Springs Road, Austell, Georgia.  On September 24, 2009, this area experienced high flood waters reaching the roof of the facility as evidenced by water marks and a drum on the roof of the building.  Sweetwater Creek is adjacent to the property.  The site includes two open warehouses and an office trailer, which were severely damaged by the flood.  Outside of the warehouses there are two concrete pits, one circular and one rectangular, both containing liquid.  These pits are believed to be part of the facility’s waste water treatment system.


Current Activities

As of January 20, 2010, all chemical containers and overpacks, all bulked  liquids and solid contamination from within the buildings on Site have  been removed and properly disposed of.  The Site is currently fenced and approrpiate EPA notifications have been posted for public information access.  

EPA' s Technical Supoort Section (TSS) had provided a risk determination for this Site.  The risk determination can be found in the documents section of the website.


Planned Removal Actions

EPA is currently processing an Action Memorandum to conduct a proposed removal action if approved.  Upon approval of such action additional action and updates will be posted.


Estimated Costs *
  Budgeted Total To Date Remaining % Remaining
Extramural Costs
ERRS - Cleanup Contractor $150,000.00 $68,784.11 $81,215.89 54.14%
TAT/START $40,000.00 $30,000.00 $10,000.00 25.00%
Intramural Costs
 
Total Site Costs $190,000.00 $98,784.11 $91,215.89 48.01%

* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.


Disposition of Wastes


Waste Stream Quantity Manifest # Disposal Facility
Chromic Acid liquids  2462 gal     
Neutral Liquids  556     
Oil  550     
Basic Solids  318     
Basic Liquids  186     
Acidic Solids  28     
Cyanide Solids     
Non Haz debris  30 yd3     


response.epa.gov/PowderSpringsRoadPlating