Initial Site Work
Powder Springs Road Plating
5491 Austell Power Springs Road, Austell, GA
Latitude: 33.8200496
Longitude: -84.6419656


POLREP No.:
10
Site #:
B443
Reporting Period:
6/1/2010-6/4/2010
D.O. #:
Start Date:
10/23/2009
Response Authority:
CERCLA
Mob Date:
10/23/2009
Response Type:
Emergency
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
GAD984318634
Contract #
EPS40704/74
RCRIS ID #:
 

Site Description

See Initial Pol Rep


Current Activities

On May 12, 2010 Region 4 signed a removal action memorandum to begin the fund lead removal.  Please see the AM in the Documents section. Work at the Site began the week of May 26, 2010 with building inspections and demolition. Demolition on main plating building including concrete pad was completed with concrete being staged for later removal from site. Surface water was pumped to an onsite frac tank


Planned Removal Actions

Additional demolition will continue to remove all structures on Site.  The rental and use of a Frac Tank to capture on Site contaminated water for future disposal.


Next Steps

Concrete and water runoff issues will be addressed as limiting offsite water infiltration becomes a critical step in minimizing additional contaminated water on Site.  Frac Tank use to prevent further onsite water runoff.


Key Issues

Prevention of ground water runoff, Disposal criteria from county to the local POTW.


Disposition of Wastes


Waste Stream Quantity Manifest # Disposal Facility
Chromic Acid liquids  2462 gal     
Neutral Liquids  556     
Oil  550     
Basic Solids  318     
Basic Liquids  186     
Acidic Solids  28     
Cyanide Solids     
Non Haz debris  30 yd3     