U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Michelin Building 3 Site PJ-3 - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region II

Subject: POLREP #4
Michelin Building 3 Site PJ-3
02XY
Milltown, NJ
Latitude: 40.4513777 Longitude: -74.4382554


To:
From: Thomas Budroe, On-Scene Coordinator
Date: 12/13/2010
Reporting Period: 12/5/2010 to 12/11/2010

1. Introduction
  1.1 Background
   
Site Number: 02XY    Contract Number:  
D.O. Number:      Action Memo Date:  
Response Authority: CERCLA    Response Type: Emergency
Response Lead: PRP    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 11/15/2010    Start Date: 11/15/2010
Demob Date:      Completion Date:  
CERCLIS ID: NJN000205896    RCRIS ID:
ERNS No.:    State Notification: 11/30/2010
FPN#:    Reimbursable Account #:


1.1.1 Incident Category

Abandoned Building containing friable asbestos.

1.1.2 Site Description

See Polrep 1.

1.1.2.1 Location

See Polrep 1.

1.1.2.2 Description of Threat

See Polrep 1.

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

See Polrep 1.



2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

The PRP is funding and subcontracting the asbestos abatement work.

2.1.2 Response Actions to Date

 

Since the last reporting period the following events have occurred:  The air clearance testing of the main building was conducted on December 7, 2010.  The analytical results were reported to the asbestos abatement subcontractor on December 8, 2010.  All air clearance analytical results were reportedly below the regulatory levels indicating the building has passed the air clearance test.  Although the asbestos abatement prime contractor stated that a copy of the analytical air clearance results would be forwarded to EPA, these results have not yet been received.  On December 9, 2010, the asbestos abatement subcontractor glove-bagged the ACM covering the two pipes on the second story of the southwest wing of Building 3.  Asbestos lying on the third story floor of the southwest wing was also removed.  The asbestos abatement subcontractor subsequently demobilized their equipment from the Site. 

While conducting work in the basement in the collapsing roof area the asbestos abatement subcontractor exposed an approximately 100 square foot area of what appears to be soil contaminated with an unknown substance.  The asbestos abatement prime contractor is making arrangements to have this contaminated soil sampled, as well as, the containers in the building.

 

 

 

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

See Polrep 1.

2.1.4 Progress Metrics

Waste Stream Medium Quantity Manifest # Treatment Disposal
 Asbestos                   Solid  40 cubic yards    Landfill  Grows Landfill North
           
           



  2.2 Planning Section
    2.2.1.1 Planned Response Activities

The PRP's contractors will conduct an asbestos abatement at the Site.

2.2.1.2 Next Steps

The PRP's contractor will sample/analyze the contaminated soil in this area, as well as, the contents of the containers in the building and subsequently conduct an asbestos abatement of the southern basement room.

2.2.2 Issues



  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  No information available at this time.

4. Personnel On Site
  No information available at this time.

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.