1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
A4QL |
|
Contract Number: |
EP-S4-07-04 |
D.O. Number: |
105 |
|
Action Memo Date: |
9/14/2010 |
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
9/29/2010 |
|
Start Date: |
9/29/2010 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
NCD986232213 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
03/12/2010 |
FPN#: |
|
|
Reimbursable Account #: |
|
For Site Actions that occurred prior to this reporting period and background information, please refer to previous Pollution Reports.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
The following actions took place during this reporting period:
- ERRS continued to demolish the ASTs and tanker trailers onsite. During this reporting period, 12 ASTs, 3 tanker trailers, and one box trailer were demolished for a total of 19 tons of steel and 1.9 tons of aluminum scrapped.
- ERRS also continued to mix the remianing sludges onsite with the cotton tash. 65,845 gallons of sludges were solidified accounting for 21 loads of material shipped off-site..
- START continued to monitor the air in the vicinity of the tanks and prepare samples for disposal of the solidified materials.
- No work took place on site on 1/10/11 due to heavy snow and ice. Work resumed on 1/11/11.
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
2.2.1.1 Planned Response Activities
During the next reporting period ERRS the following activities are planned:
- ERRS will solidify and dispose of any remaining sludges onsite;
- Recyclable materials (tires, steel, aluminum, etc.) will continue to be removed from site;
- START will conduct soil sampling in probable impacted areas to determine the need for any soil removal;
- If needed, ERRS will conduct soil removal;
- ERRS will conduct site restoration activities such as removing impacted concrete, pressure washing impacted surfaces, and grading.
2.2.1.2 Next Steps
Beyond the tasks listed above, the installation of a Site monitoring well may be completed if deemed appropriate.
2.2.2 Issues
|
|
2.3 Logistics Section
|
|
|
At this time, this Site poses no logistical issues.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
No information available at this time.
|
4. Personnel On Site
|
|
Maximum staffing during this reporting period:
1 - EPA OSC
1 - START (Otie)
6 - ERRS (ER)
|
5. Definition of Terms
|
|
AST - Above Ground Storage Tank
BTU - British Thermal Unit
CI - Civil Investigator
EPA - Environmental Protection Agency
EPM - Enforcement Project Manager
ERRB - Emergency Response and Removal Branch
ERRS - Emergency and Rapid Response Services
NFPA - National Fire Protection Association
NPP - National Petroleum Packers
OSC - On Scene Coordinator
PPE - Personal Protective Equipment
PRP - Potentially Responsible Party
RFQ - Request For Quote
START - Superfund Technical Assessment and Response Team
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|
No information available at this time.
|