Subject: POLREP #11
Progress
ESI-PRP Removal
B5YS
Indianapolis, IN
Latitude: 39.9128600 Longitude: -86.2423680


To: Sue Michael, City of Indianapolis
Tom White, Citizens Energy Group
Harry Atkinson, IDEM
Ryan Groves, IDEM
Megan Nagle, IDEM
George Ritchotte, IDEM
Jason Doerflein, Marion County Health Department
Sam Bruner, Pike Fire Department
John Maritote, U.S. EPA Region V
Janet Pope, U.S. EPA Region V
Kim Cussen, United Water
Stan Rigney, IDEM
Randy Braun, IDEM
Maupin Natalie, IDEM
Eric Kaufman, Marion County Health Department
Jason Ravenscroft, Marion County Health Department
Dan Sparks, USFWS
Ed Karecki, USFWS
Bob Masbaum, Citizens Energy Group
Kristen Heitman, Providence Wildlife
Michael Massonne, City of Indianapolis
Cheryl Carlson, Citizens Energy Group
Emily Mack, City of Indianapolis
Thomas Marks, U.S. EPA
Rex Osborn, IDEM
Gabriele Hauer, IDEM
Max Michael, IDEM
Deirdre Wyatt, IDEM
Jennifer Schick, City of Indianapolis

From: Verneta Simon & Anita L. Boseman, On-Scene Coordinators
Date: 7/11/2011
Reporting Period: 7/5/2011 - 7/8/201

1. Introduction
  1.1 Background
   
Site Number: B5YS    Contract Number:  
D.O. Number:      Action Memo Date: 9/30/2010
Response Authority: CERCLA    Response Type: PRP Oversight
Response Lead: PRP    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 4/6/2011    Start Date: 4/6/2011
Demob Date:      Completion Date:  
CERCLIS ID: INN0051050501    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category
Bankrupt Commercial Used Oils Facility

1.1.2 Site Description
See POLREP 1

1.1.2.1 Location
4910 West 86th Street, Indianapolis, Indiana 46268



2. Current Activities
  2.1 Operations Section
   

2.1.1 Narrative
See POLREP 1

2.1.2 Response Actions to Date


 

On July 5, 2011, Trihydro continued hard/flexible piping GAC connections to the City of Indianapolis sanitary sewer manway and to the ditch leading to Oil Creek. Piping connections are being made for potential future discharge, pending City of Indianapolis approval.

-Brenntag Midsouth, Inc. was on site and removed their 4 empty hypochlorite solution totes.

-City of Indianapolis personnel were on site and collected waste characterization samples for the northeast area stormwater.

·         Pre-treatment and post-treatment samples were collected for future potential Special Discharge Agreements.

-The Cornell DAF pumps were located and photos of the LEAF equipment for repossession were uploaded to the website.

 

On July 6, 2011, AVS hauled off 2 loads (11,000 gal) of oily water from the concrete access pit to Clean Water’s facility in Dayton, OH.

-Midwest began cleaning out frac tanks 7-10, with intentions to potentially use them for stormwater storage in the future.

·         Midwest has vacuumed out 3,500 gal of oily water from frac tanks 7 and 8.

·         Midwest is pressure washing frac tank 7 and is encountered tar along the bottom of the tank and around the heating coils.

·         Oily water vacuumed out has been pumped into the center and east solidification pits.

-Midwest completed drum sampling activities.

-Asphalt Materials began grading activities in the areas planned for permanent berm construction.

 

On July 7, 2011, AVS hauled off 2 loads (9,800 gal) of oily water from the concrete access pit to Clean Water’s facility in Dayton, OH.

-Midwest continued cleaning out frac tanks 7-10.

-Harvest Technologies was on site as a potential vendor for solidification agents, specifically wood pulp.

 

On July 8, 2011, AVS hauled off 2 loads (9,100 gal) of oily water from the concrete access pit to Clean Water’s facility in Dayton, OH.

-Trihydro continued hard/flexible piping GAC connections to the City sanitary sewer manway and to the ditch leading to Oil Creek.

-Trihydro pumped approximately 40,000 gal of oily water from the northeast area into the raw water frac tanks.

-Midwest continued cleaning out frac tanks 7-10.

 

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
N/A

2.1.4 Progress Metrics

Waste Stream

Medium

Quantity

Manifest #

Treatment

Disposal

Oily Water

Liquid

2,169,090 gallons

X

Stormwater*

Liquid

424,956 gallons

X

Tank 51 Containment

Liquid

335,120 gallons

 

X

 



  2.2 Planning Section
    2.2.1 Anticipated Activities
  • Revised Work Plan
2.2.1.1 Planned Response Activities
None

2.2.1.2 Next Steps
US EPA will provide oversight of PRP Group removal activities.

Tank 51 activities.

Frac tank 7-10 and tank 6 cleaning activities.

2.2.2 Issues
Groundwater infiltration is suspected in the sanitary sewer system on Site. Trihydro is investigating potential options for mitigating infiltration. 

Standing water has been observed in several locations around the site. Warmer weather can lead to mosquito breeding in standing water. EPA has requested that Trihydro address all standing water on site as soon as possible.

Ongoing management of wildlife at the site due to nearby ecosystems.


  2.3 Logistics Section
    Not applicable.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer
Not applicable.

2.6 Liaison Officer
Not applicable.

2.7 Information Officer
2.7.1 Public Information Officer

2.7.2 Community Involvement Coordinator
The next community meeting will be held on August 1, 2011 at 2 pm.


3. Participating Entities
  3.1 Unified Command
Indiana Department of Environmental Management
Indianapolis Department of Public Works
Pike Township Fire Department
City of Indianapolis

3.2 Cooperating Agencies
Marion County Health Department

4. Personnel On Site
  U.S. EPA
START Contractor


5. Definition of Terms
 

ASAOC – Administrative Settlement Agreement on Consent
ERRS – Emergency and Rapid Response Services

IDEM – Indiana Department of Environmental Management

OSC – On-Scene Coordinator

POLREP – Pollution Report
PRP - Potentially Responsible Party
RCRA – Resource Conservation and Recovery Act

START – Superfund Technical Assessment and Response Team

U.S. EPA – United States Environmental Protection Agency



6. Additional sources of information
  6.1 Internet location of additional information/report
For additional information, please refer to the US EPA lead removal action website at www.epaosc.org/esi


6.2 Reporting Schedule
The next POLREP will be submitted at a date to be determined.

7. Situational Reference Materials
  For additional information, please refer to the documents section at www.epaosc.org/esi