U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
ESI-PRP Removal - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #19
Progress
ESI-PRP Removal
B5YS
Indianapolis, IN
Latitude: 39.9128600 Longitude: -86.2423680


To: Sue Michael, City of Indianapolis
Tom White, Citizens Energy Group
Harry Atkinson, IDEM
Ryan Groves, IDEM
Megan Nagle, IDEM
George Ritchotte, IDEM
Jason Doerflein, Marion County Health Department
Sam Bruner, Pike Fire Department
John Maritote, U.S. EPA Region V
Janet Pope, U.S. EPA Region V
Kim Cussen, United Water
Stan Rigney, IDEM
Randy Braun, IDEM
Maupin Natalie, IDEM
Eric Kaufman, Marion County Health Department
Jason Ravenscroft, Marion County Health Department
Dan Sparks, USFWS
Ed Karecki, USFWS
Bob Masbaum, Citizens Energy Group
Kristen Heitman, Providence Wildlife
Michael Massonne, City of Indianapolis
Cheryl Carlson, Citizens Energy Group
Emily Mack, City of Indianapolis
Thomas Marks, U.S. EPA
Rex Osborn, IDEM
Gabriele Hauer, IDEM
Max Michael, IDEM
Deirdre Wyatt, IDEM
Jennifer Schick, City of Indianapolis

From: Verneta Simon & Anita L. Boseman, On-Scene Coordinators
Date: 9/6/2011
Reporting Period: 8/29/2011 - 9/2/2011

1. Introduction
  1.1 Background
   
Site Number: B5YS    Contract Number:  
D.O. Number:      Action Memo Date: 9/30/2010
Response Authority: CERCLA    Response Type: PRP Oversight
Response Lead: PRP    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 4/6/2011    Start Date: 4/6/2011
Demob Date:      Completion Date:  
CERCLIS ID: INN0051050501    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category
Bankrupt Commercial Used Oils Facility

1.1.2 Site Description
See POLREP 1

1.1.2.1 Location
4910 West 86th Street, Indianapolis, Indiana 46268



2. Current Activities
  2.1 Operations Section
   
2.1.1 Narrative
See POLREP 1

2.1.2 Response Actions to Date 

On August 29, 2011, Midwest hauled off 2 loads (12,000 gal) of oily water from the control structure and Frac Tank 6 to United Waste Water Inc.'s facility in Cincinnati, OH.

  • Midwest hauled off (5) 20 cyd roll-off boxes of solidified sludge to Southside Landfill in Indianapolis, IN.
  • Midwest completed final cleaning of Tank 45.
  • Midwest began sludge removal in Tank 7.
  • A visual inspection of Tanks 45 was conducted and there was no visible product in the tank. The condition was documented with two photos of the tank.
  • Midwest continued solidifying material in the solidification pits with wood pulp.

On August 30, 2011, Midwest hauled off (5) 20 cyd roll-off boxes of solidified sludge to Southside Landfill in Indianapolis, IN.

  • Midwest continued solidifying material in the solidification pits with wood pulp.
  • Midwest continued sludge removal in Tank 7.
  • OSC Verneta Simon and Steve Fleming (Safety Kleen) were on site to discuss the Agency's work plan approval letter dated August 11, 2011. 
  • On August 31, 2011, Midwest hauled off (5) 20 cyd roll-off boxes of solidified sludge to Southside Landfill in Indianapolis, IN.
  • A trace amount of rain fell at the Site.  The storm water did not pool above manholes or escape the Site.
  • Midwest continued solidifying sludge in the solidification pits with wood pulp.
  • Midwest continued sludge removal in Tank 7.
  • Midwest had (4) 50,000 pound loads of wood pulp solidification agent delivered.
  • TriHydro treated 4,900 gallons of storm water and stored the treated water in frac tanks.

On September 1, 2011, Midwest hauled off (5) 20 cyd roll-off boxes of solidified sludge to Southside Landfill in Indianapolis, IN. 

  • Midwest continued solidifying material in the solidification pits with wood pulp. 
  • Midwest completed final cleaning of Tank 7.
  • A visual inspection of Tanks 7 was conducted and there was no visible product in the tank. The condition was documented with two photos of the tank.
  • TriHydro treated raw stormwater and stored it in frac tanks.
  • Jon Davenport of Wendt Rigging was on site to look at the centrifuge and associated machinery that he will be hauling for Mr. Cohen of Aaron Equipment. The centrifuge is scheduled to be hauled off site on Thursday, September 8, 2011.

On September 2, 2011, Midwest hauled off (2) 20 cyd roll off boxes of solidified sludge to Southside Landfill in Indianapolis, IN.

  • Midwest continued solidifying material in the solidification pits with wood pulp.
  • Midwest began cleaning the API sump pit.
  • TriHydro treated 22,500 gallons of storm water and stored the treated water in frac tanks. Midwest is also using some of the treated water for their Site cleaning operations.
  • Kristen Heitman (Providence Wildlife) provided a status update on the ducklings rescued from the Site. Per K. Heitman, the ducklings were merged with a mother mallard, who was hit by a car, and her surviving offspring. They all incorporated well and the mother mallard accepted the new ducklings as her own. When the mother mallard recovered completely from her injuries, she and all the ducklings were released together as one family unit and continue to thrive in the wild now on a pond that is overseen by one of the Providence Wildlife volunteers.

A map of the Site produced by START shows the Trihydro cleanup progress by tank and pit and is available in the documents section.

The wood pulp solidification material is a reclaimed/recycled product.  As of September 2, 2011, approximately 700,000 pounds had been used to solidify waste sludge.

A community flyer was distributed on August 16, 2011 regarding Site progress and odor concerns. The community flyer is available in the documents section.

2.1.3 Enforcement Activities, Identity of Potentially

Responsible Parties (PRPs)
N/A

 

 

2.1.4 Progress Metrics

 

Waste Stream  Medium  Quantity  Discharge Treatment  Disposal 
Oily Water Liquid 3,121,734 gallons   X  
Stormwater Liquid 424,956 gallons   X  
Tank 51 Containment  Liquid 335,120 gallons   X  
Totes and Drums Liquid 3,885 gallons         X  
Solidified Sludge Solid 940 cyd     X
Treated Stormwater Liquid 21,735 gallons X
 



  2.2 Planning Section
    2.2.1 Anticipated Activities
  • Pilot test for bunker tank removal activities.
2.2.1.1 Planned Response Activities
None

2.2.1.2 Next Steps
US EPA will provide oversight of PRP Group removal activities.

Continue API sump pit cleaning.

Begin cleaning out the east containment and containment south of the Solids Building (containing Tanks 4 & 12-15).

2.2.2 Issues
Starting in Mid-July, the weather became very hot and humid, and special care was taken to make sure that people working outside are well hydrated and taking adequate breaks

Groundwater infiltration is suspected in the sanitary sewer system on Site. TriHydro is investigating potential options for mitigating infiltration. 

Standing water has been observed in several locations around the site. Warmer weather can lead to mosquito breeding in standing water. EPA has requested that Trihydro address all standing water on site as soon as possible.

Ongoing management of wildlife at the site due to nearby ecosystems.

In previous POLREPs an incorrect name was used when referring to the oily water disposal facility. The correct name should be United Waste Water, Inc. not United Water.

"Control structure" refers to the pit or sump attached to and immediately south of the million gallon bunker tanks.  It has been referred to as "access pit" and "access pit/control structure" in the past.



  2.3 Logistics Section
    Not applicable.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer
Not applicable.

2.6 Liaison Officer
Not applicable.

2.7 Information Officer
2.7.1 Public Information Officer

2.7.2 Community Involvement Coordinator
A date has not been selected for the next community meeting.


3. Participating Entities
  3.1 Unified Command
Indiana Department of Environmental Management
Indianapolis Department of Public Works
Pike Township Fire Department
City of Indianapolis

3.2 Cooperating Agencies
Marion County Health Department

4. Personnel On Site
  U.S. EPA
START Contractor


5. Definition of Terms
 

ASAOC – Administrative Settlement Agreement on Consent
ERRS – Emergency and Rapid Response Services

IDEM – Indiana Department of Environmental Management

OSC – On-Scene Coordinator

POLREP – Pollution Report
PRP - Potentially Responsible Party
RCRA – Resource Conservation and Recovery Act

START – Superfund Technical Assessment and Response Team

U.S. EPA – United States Environmental Protection Agency



6. Additional sources of information
  6.1 Internet location of additional information/report
For additional information, please refer to the US EPA lead removal action website at www.epaosc.org/esi


6.2 Reporting Schedule
The next POLREP will be submitted at a date to be determined.