Site Number: |
B5VC |
|
Contract Number: |
EP-S5-09-05 |
D.O. Number: |
0027 |
|
Action Memo Date: |
5/20/2010 |
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
12/9/2009 |
|
Start Date: |
7/12/2010 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
OHN000510416 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
CERCLA Incident Category: Inactive Recycling Facility
1.1.2 Site Description
1.1.2.1 Location
See Initial Polrep.
1.1.2.2 Description of Threat
The presence of heavy metals, PCBs, asbestos and numerous drums and compressed gas cylinders presents potential threats to human health and the environment by exposures to impacted air, soil and water at and around the Site.
See Initial Polrep for additional information.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Primary contaminants of concern identified during the Site Assessment included: heavy metals (antimony, arsenic, cadmium, lead, mercury), asbestos (chrysotile) and PCBs (Aroclor 1242 and 1254).
See Initial Polrep for additional information.
|
|
|
2.1.1 Narrative
The Time-Critical Removal Action at the New Lyme Metals Site is addressing the presence of heavy metals and PCBs in the soils by excavating and disposing of the impacted material off site. All asbestos containing materials, drums and compressed gas cylinders will also be removed and disposed of at an off site facility. Air monitoring and sampling is being conducted for the protection of the workers and the public. In addition, well samples have been collected to determine if any of the contaminants on Site have impacted the ground water.
2.1.2 Response Actions to Date
During the period of October 3, 2011 to October 8, 2011, U.S.EPA along with START and ERRS contractors continued removal activities at the Site, these activities included:
- Pumped out approximately 1,500 gallons of leaded gasoline/water mixture and rinsate from UST in grid J-3
- Removed UST (9 feet long and 4 foot in diameter) and rendered it unusable
- Began excavating and stockpiling the surrounding contaminated soils for disposal
- Continued backfilling and grading of excavated areas
- Received 208 loads of backfill for restoration
- Continued managing water by pumping out clean excavation to allow for site restoration
- Continued decontaminating and demobilizing equipment
- Installed water treatment systems at two residences
- Collected 16 confirmation soil samples
Analytical results of the liquids in the UST indicated the contents exceeded regulatory limits for flashpoint (D001), TCLP Lead (D008), TCLP Benzene (D018) and TCLP 1,2-Dichloroethane (D028). A number of other constituents were also identified in the liquids of the tank including barium and o-Cresol. The tank was in extremely poor condition and leaking into the surrounding soils. Air monitoring with a MultiRAE Plus detected total volatile organic compound concentrations in the open air downwind of the tank as high at 50 ppm. Although the use of the tank and the source of all the liquids in the tank are unknown, the Site was operated as a scrap metal salvage yard and the tank may have been used in connection with the scrap metal salvage yard business to hold liquids from machinery and other materials being scrapped including waste fuels, oils, lubricants and solvents. The liquids in the tank were transported and disposed of based on the analytical results as waste flammable liquids toxic for lead, benzene and 1,2-dichloroethane.
Wet conditions and heavy rains continued to hinder restoration activities.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
U.S. EPA continues its efforts in identifying viable potentially responsible parties as well as identifying and locating additional locations where the operations took place. Currently, U.S. EPA has identified two possible locations where activities, similar to those at New Lyme Metals, may have taken place.
2.1.4 Progress Metrics
This Reporting Period:
Waste Stream |
Quantity (gallons) |
Date |
Manifest # |
Destination |
Waste Flammable Liquids, toxic |
1500 |
10/8/2011 |
7600870 |
Chemtron Corporation, 35850 Schneider Court, Avon, OH 44011 |
To Date:
526.72 tons of Non-Hazardous Debris has been disposed of at American Landfill in Waynesburg, Ohio
6,183.33 tons of Non-Hazardous Soils has been disposed of at American Landfill in Waynesburg, Ohio (includes 620 tons of treated TCLP soils)
32.62 tons of Non-Friable Asbestos containing material has been disposed of at American Landfill, in Waynesburg, Ohio
1,800.03 tons of RQ, Polychlorinated Biphenyls, Solid Mixture, UN3432 material has been disposed of at CWM Chemical Services in Model City, New York (includes 570 tons of treated TCLP soils)
1,500 gallons of RQ, Waste Flammable Liquids, UN1992, toxic (D001, D008, D018, D028) disposed of at Chemtron Corporation in Avon, Ohio
16 55-gallon drums of Oily Water Mixture disposed of at EQ Ohio in Canton, Ohio
1 35-gallon drum of RQ, Chromic Acid Solution, UN1755 (D002, D007) disposed of at EQ Ohio in Canton, Ohio
2 Compressed Gas Cylinders reclaimed by Air Gas in Cleveland, Ohio
2 Compressed Gas Cylinder reclaimed by Butler Gas Products in New Brighton, Pennsylvania
144,000 gallons of contact storm water run-off has been treated for PCBs and heavy metals and discharged
39.43 tons of scrap/used tires recycled at Liberty Tire Recycling in Minerva, Ohio
12.27 tons of scrap iron and metal recycled at Ashtabula Iron & Metal in Ashtabula, Ohio
9.5 cubic yards of woody debris chipped and reused as mulch during restoration on Site
25 cubic yards of stone and rock were transported off site for reuse in landscaping
|