Site Number: |
A3PZ |
|
Contract Number: |
EP-S3-07-03 |
D.O. Number: |
|
|
Action Memo Date: |
9/1/2010 |
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
7/1/2010 |
|
Start Date: |
9/17/2010 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
PAN000306719 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Time-Critical Removal
1.1.2 Site Description
The Site is characterized as a time-critical removal. The Site includes land that was used formerly for the commercial growing and harvesting of fruit from orchard trees and are currently zoned for residential or public use primarily in North Whitehall Township, PA. Lead arsenate pesticide was historically used for several decades at the Site until its use was banned in 1988 by EPA. Elevated levels of arsenic and lead have been detected in surface soil samples on residential parcels and in public use areas. The FMO Pesticide Action Memo was submitted by the OSC and signed on September 1, 2010 approving a Removal Action which addresses contamination at residential parcels.
1.1.2.1 Location
The site is primarily located in the Orefield/Schnecksville area of North Whitehall Township, Lehigh County, Pennsylvania.
1.1.2.2 Description of Threat
Incidental ingestion of lead and arsenic through direct contact with contaminated soil, or ingestion of contaminants from small particles that have been aerosolized from the disturbance of soil.
|
|
|
2.2.1 Anticipated Activities
If the ground temperature holds above 40 degrees Fahrenheit, and is projected to remain so through mid-December, then sod will be installed in the front yard of the 23rd property the week of November 28th. Otherwise, seeding and erosion control matting will be installed. ERRS will continue to water sod, as needed, at properties indicated by EPA.
Post-excavation samples will be shipped to an offsite laboratory for arsenic and lead analysis. Post-excavation walk-throughs are being scheduled at residences at which inital rooting of the sod has occurred. Initial rooting of the sod can take approximately three to four weeks. EPA will prepare the closeout letter for those properties where we have completed post-excavation walkthoughs. This letter will include a map showing where EPA excavated and restored the property. Post-excavation sampling results will be provided in a separate letter due to the extended turnaround time for the receipt of the validated data.
Crew will remobe on November 28th to complete work at the last property.
2.2.1.2 Next Steps
2.2.2 Issues
None
|
|
On November 11, 2011, 1 Weston, 10 Kemron, 1 Kemron subcontractor and 1 EPA personnel were onsite.
On November 12, 2011, 4 Kemron subcontractor, 2 Kemron personnel were onsite.
On November 13, 2011, no personnel were onsite.
On November 14, 2011, 1 Weston, 10 Kemron, 5 Kemron subcontractor and 1 EPA personnel were onsite.
On November 15, 2011, 1 Weston, 10 Kemron, 5 Kemron subcontractor and 1 EPA personnel were onsite.
On November 16, 2011, 1 Weston, 10 Kemron, 2 Kemron subcontractor and 1 EPA personnel were onsite.
On November 17, 2011, 1 Weston, 10 Kemron and 1 EPA personnel were onsite.
On November 18, 2011, 1 Weston, 10 Kemron and 1 EPA personnel were onsite.
|