U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
ESI-PRP Removal - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #37
Progress
ESI-PRP Removal
B5YS
Indianapolis, IN
Latitude: 39.9128600 Longitude: -86.2423680


To: Sue Michael, City of Indianapolis
Tom White, Citizens Energy Group
Harry Atkinson, IDEM
Ryan Groves, IDEM
Megan Nagle, IDEM
George Ritchotte, IDEM
Jason Doerflein, Marion County Health Department
Sam Bruner, Pike Fire Department
John Maritote, U.S. EPA Region V
Janet Pope, U.S. EPA Region V
Kim Cussen, United Water
Stan Rigney, IDEM
Randy Braun, IDEM
Maupin Natalie, IDEM
Eric Kaufman, Marion County Health Department
Jason Ravenscroft, Marion County Health Department
Dan Sparks, USFWS
Ed Karecki, USFWS
Bob Masbaum, Citizens Energy Group
Kristen Heitman, Providence Wildlife
Michael Massonne, City of Indianapolis
Cheryl Carlson, Citizens Energy Group
Emily Mack, City of Indianapolis
Thomas Marks, U.S. EPA
Rex Osborn, IDEM
Gabriele Hauer, IDEM
Max Michael, IDEM
Deirdre Wyatt, IDEM
Jennifer Schick, City of Indianapolis

From: Verrneta Simon, On-Scene Coordinator
Date: 1/4/2012
Reporting Period: 12/27/2011-12/30/2011

1. Introduction
  1.1 Background
   
Site Number: B5YS    Contract Number:  
D.O. Number:      Action Memo Date: 9/30/2010
Response Authority: CERCLA    Response Type: PRP Oversight
Response Lead: PRP    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 4/6/2011    Start Date: 4/6/2011
Demob Date:      Completion Date:  
CERCLIS ID: INN0051050501    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category
Bankrupt Commercial Used Oils Facility

1.1.2 Site Description
See POLREP 1

1.1.2.1 Location
4910 West 86th Street, Indianapolis, Indiana 46268



2. Current Activities
  2.1 Operations Section
   
2.1.1 Narrative
See POLREP 1

2.1.2 Response Actions to Date 

On December 27, 2011, Midwest hauled off (6) 30 cyd roll-off boxes of solidified sludge to Southside Landfill in Indianapolis, IN.
  • Trihydro discharged approximately 13,500 gal of northeast area stormwater treated by the GAC system to Oil Creek.
  • 0.5" of snow fell during the day.
On December 28, 2011, AVS hauled off 2 loads (12,400 gal) of oily water from frac tank 11 (originating from the solidification pits) to United Waste Water Inc.’s facility in Cincinnati, OH.
  • Midwest hauled off (8) 20 cyd roll-off boxes of solidified sludge to Southside Landfill in Indianapolis, IN.
  • Trihydro discharged approximately 8,000 gal of northeast area stormwater treated by the GAC system to Oil Creek.
On December 29, 2011, AVS hauled off 2 loads (12,000 gal) of stormwater from the Tank 51 containment frac tank to United Waste Water Inc.’s facility in Cincinnati, OH.
  • Midwest hauled off (6) 20 cyd roll-off boxes of solidified sludge to Southside Landfill in Indianapolis, IN.
  • Midwest started cleaning the Chemical Building.
  • Midwest worked on identifying an entity that will accept and recycle virgin flocculent in the Chemical Building.
  • Midwest deconned a long-reach excavator.
  • Trihydro discharged approximately 10,000 gal of northeast area stormwater treated by the GAC system to Oil Creek.
  • The east wall of the east bunker tank was observed to be flexing inward.
  • Steve Jones of the Pike Township Fire Department was on site.  He inspected a tank in the solids building and looked at the bunker tanks.
On December 30, 2011, Midwest hauled off 2 loads (12,400 gal) of oily water from the southwest area storm sewer and west solidification pit to United Waste Water Inc.’s facility in Cincinnati, OH.
  • Midwest hauled off (7) 20 cyd roll-off boxes of solidified sludge to Southside Landfill in Indianapolis, IN.
  • Midwest started foam-sealing pipe run holes in the solids building.
  • Trihydro discharged approximately 10,000 gal of northeast area stormwater treated by the GAC system to Oil Creek.
  • Trihydro moved approximately 3,500 gal of Tank 51 secondary containment stormwater into the Tank 51 frac tank.
    The wood pulp and sawdust solidification materials are reclaimed/recycled products.  As of December 30, 2011, approximately 11,700,000 pounds of wood pulp solidification media, 1,800 tons of sawdust solidification media have been used to solidify sludge.  Additionally, 860 tons of lime solidification media and 45 tons of TerraBond solidification media had been used to solidify waste sludge.


    2.1.3 Enforcement Activities, Identity of Potentially 

    Responsible Parties (PRPs)
    N/A

     
    2.1.4 Progress Metrics

     

    Waste Stream  Medium  Quantity  Discharge Treatment  Disposal 
    Oily Water Liquid 4,203,907 gallons   X  
    Stormwater Liquid 426,156 gallons   X  
    Tank 51 Containment  Liquid 452,051 gallons   X  
    Totes and Drums Liquid 11,935 gallons   X  
    Solidified Sludge Solid 24,200 cyd     X
    Unsolidified Sludge Liquid 200 cyd   X  
    Treated Stormwater Liquid 723,665 gallons X

     


      2.2 Planning Section
        2.2.1 Anticipated Activities
    • Increase the number of contractors on site to expedite site cleanup.
    2.2.1.1 Planned Response Activities
    None

    2.2.1.2 Next Steps
    U.S. EPA will provide oversight of PRP Group removal activities.


    2.2.2 Issues
    None


      2.3 Logistics Section
        Not applicable.

      2.4 Finance Section
        No information available at this time.

      2.5 Other Command Staff
        2.5.1 Safety Officer
    Not applicable.

    2.6 Liaison Officer
    Not applicable.

    2.7 Information Officer
    2.7.1 Public Information Officer

    2.7.2 Community Involvement Coordinator
    A date has not been selected for the next community meeting.

    3. Participating Entities
      3.1 Unified Command
    Indiana Department of Environmental Management
    Indianapolis Department of Public Works
    Pike Township Fire Department
    City of Indianapolis

    3.2 Cooperating Agencies
    Marion County Health Department

    4. Personnel On Site
     
    START Contractor
    Trihydro
    Midwest (subcontractor to Trihydro)
    EQ (subcontractor to Trihydro)
    Roger Ward Engineering (subcontractor to Trihydro)


    5. Definition of Terms
     

    ASAOC – Administrative Settlement Agreement on Consent
    ERRS – Emergency and Rapid Response Services

    IDEM – Indiana Department of Environmental Management

    OSC – On-Scene Coordinator

    POLREP – Pollution Report
    PRP - Potentially Responsible Party
    RCRA – Resource Conservation and Recovery Act

    START – Superfund Technical Assessment and Response Team

    U.S. EPA – United States Environmental Protection Agency


    6. Additional sources of information
      6.1 Internet location of additional information/report
    For additional information, please refer to the US EPA lead removal action website at www.epaosc.org/esi

    6.2 Reporting Schedule
    The next POLREP will be submitted at a date to be determined.

    7. Situational Reference Materials
      For additional information, please refer to the documents section at www.epaosc.org/esi