Date:
Friday, February 17, 2012
From:
Paul Doherty

To:
Mary Peterson, USEPA R7

Subject: 

FINAL
Moberly Former Manufactured Gas Plant
501 Franklin Street, Moberly, MO
Latitude: 39.4225000
Longitude: -92.4392000


POLREP No.:
3
Site #:
A78Z
Reporting Period:
D.O. #:
Start Date:
 
Response Authority:
CERCLA
Mob Date:
 
Response Type:
Non-Time-Critical
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
2/17/2012
Incident Category:
Removal Action
CERCLIS ID #:
MOD985796135
Contract #
RCRIS ID #:
 

Site Description

The Moberly Former Manufactured Gas Plant (FMGP) site is located at 501 Franklin Street in the city of Moberly, Missouri.  The site is approximately one acre in size and located within the Ameren Service Center. The entire service center encompasses approximately three acres and is located in a light commercial/ residential area within the city limits of Moberly.  

The Moberly FMGP was in operation as early as 1875 and continued until 1935.  Ownership of the site changed to Union Electric in 1983. Union Electric is now known as Ameren. The service center is currently used by Ameren for gas and electric service distribution.



Current Activities

On-site contamination was addressed in the 2008 remediation action.  Off-site contamination on the City of Moberly’s right-of-way along a section of Dameron Street, north and east of the Ameren UE facility was addressed in a remediation effort conducted in March 2010.  Approximately 3,000 to 4,000 cubic yards of contaminated soil were excavated and transported to the Macon Landfill for disposal.  The railroad tracks to the north prevent further excavation in a northerly direction.  Excavation in an easterly direction was limited by the presence of soil contamination not associated with the FMGP.  Backfill and site restoration activities were completed the week of 4/21/2010.  Demobilization of equipment and materials occurred the following week.  

In November 2011, the EPA received a copy of the signed Institutional Controls (IC) environmental covenant and confirmation that the IC was filed with the County Recorder.

Final oversight costs were billed and paid by the RP and on February 17, 2012 EPA notified the RP that conditions of the AOC were met and the AOC was terminated.


Planned Removal Actions

There are no further planned removal actions.


Next Steps

NA


Key Issues

NA


Estimated Costs *
  Budgeted Total To Date Remaining % Remaining
Extramural Costs
Intramural Costs
 
Total Site Costs $0.00 $0.00 $0.00 0.00%

* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.


Disposition of Wastes

3,000 to 4,000 cubic yeards of contaminated soil went to Macon Landfill for disposal


Waste Stream Quantity Manifest # Disposal Facility
contaminated soil  3,000 to 4,000 CY    Macon Landfill 


response.epa.gov/MoberlyFMGP

POLREP #3 Last Updated 2/24/2012