U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Sunoco Pipeline Wellington Ohio - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #4
Sunoco Pipeline Wellington Ohio

Wellington, OH
Latitude: 41.1792677 Longitude: -82.2159290


To:
From: Joe Fredle, On-Scene Coordinator

Date: 2/27/2012
Reporting Period: 1/24/12 - 2/24/12

1. Introduction
  1.1 Background
   
Site Number:      Contract Number:  
D.O. Number:      Action Memo Date:  
Response Authority: OPA    Response Type: Emergency
Response Lead: EPA    Incident Category: Removal Assessment
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 1/13/2012    Start Date: 1/13/2012
Demob Date:      Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#: E12508    Reimbursable Account #:

see polrep 1

2. Current Activities
  2.1 Operations Section
     Response Actions to Date

Air

As of 1/22 the USEPA halted their air monitoring support activities, SUNOCO continued until 2/21. 

White Ditch

There is no longer a visible sheen in the stream during undisturbed conditions. 

Aeration activities have been halted in the stream.

All containment dams in the stream have been removed along with any contaminated soil in the vicinity of those dams.  A new under flow dam has been constructed at Peck Rd. as a precaution.

Zone 1

All grossly contaminated soils have been excavated and disposed of off site.

The pipeline has been repaired and put back in use.

 Progress Metrics

Waste Stream Medium Quantity Manifest # Treatment Disposal
 recovered gasoline liquid 30,510 gal.    recycle  
 recovered water contaminated with disolved organics liquid 456,142 gal.    onsite and offsite  
 gasoline contaminated soil  solid  8664 cubic yards      landfill or incineration


  2.2 Planning Section
    Evaluation of stream sediment is ongoing.

Evaluation of residual soil contamination is ongoing.

  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  No information available at this time.

4. Personnel On Site
  No information available at this time.

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.