U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Three"N" One Product - FPN E12625 - Removal Polrep
Initial Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region VI

Subject: POLREP #1
Initial
Three"N" One Product - FPN E12625
V6NM
Shreveport, LA
Latitude: 32.6304540 Longitude: -93.8205060


To: Lawrence Stanton, EPA HQ
Peter Ricca, LDEQ
Ragan Broyles, Superfund Division

From: Bryant Smalley, OSC
Date: 2/11/2013
Reporting Period: 8/31/2012 - 1/31/2013

1. Introduction
  1.1 Background
   
Site Number: V6NM    Contract Number:  
D.O. Number:      Action Memo Date:  
Response Authority: OPA    Response Type: Emergency
Response Lead: EPA    Incident Category: Removal Assessment
NPL Status: Non NPL    Operable Unit:
Mobilization Date:      Start Date: 8/31/2012
Demob Date:      Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#: E12625    Reimbursable Account #:

1.1.1 Incident Category
Assessment, potential removal of a tank battery and plugging and abandonment (P&A) of the orphaned well. 

1.1.2 Site Description
The facility consists of a tank battery with one 200 barrel oil tank, an oil/water separator and a produced water tank, and an orphaned production well, identified as the Oden 001; (SN 990180).

1.1.2.1 Location

The facility is located in a rural area on the East side of Hwy 71, approximately 3 miles North of State Route 538, North of Shreveport, Caddo Parish, LA, in the Caddo Pines Island Field. Section 20, Township 19N, Range 14W.
Lat: 32.6304N Long: -93.820636W

1.1.2.2 Description of Threat
The well is unsecured and reportedly leaking oil.  The oil tank is partially full and secondary containment is circumvented due to open drain pipes through the containment wall.  Drainage from the facility will travel South approximately 75 yards into an unnamed creek; thence to the Southwest approximately .5 miles to a perennial drainage channel; thence to Twelvemile Bayou.

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Due to the unsecured condition of the wellhead, it appears that rainwater is entering the wellhead and displacing the oil, causing the oil to overflow and spill on to the ground.  Additionally, the tanks in the tank battery are in degraded condition and currently have no actual secondary containment.  An actual and substantial threat of discharge was determined to exist by the Federal On-scene Coordinator (FOSC).  Catastrophic failure of the oil tank is possible and discharge of oil from the wellhead into site drainage appears imminent.  As a result, the drainage channel and Twelvemile Bayou would be impacted if action is not taken to mitigate this threat.

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative
On August 3, 2012, Louisiana Department of Natural Resources (LDNR), Office of Conservation, referred this leaking orphaned well to the Environmental Protection Agency (EPA) Region 6, to be considered for Oil Pollution Act (OPA) response actions.

2.1.2 Response Actions to Date
On October 3, 2012, EPA and EPA’s technical contractor (START) visit the site with LDNR Agent, William Sniffen to conduct a more comprehensive assessment. The assessment confirmed the well is definitely leaking oil and the Tank Battery is in poor condition.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
EPA has conducted an RP research at the Caddo Parish courthouse and sent Notices of Federal Interest (NOFIs) to the potential Responsible Parties. According to LDNR information, the last known Owner/Operator was Three “N” One Production.  Due to unclear information uncovered in the Title search, NOFIs were sent to Nadel & Gussman–Jetta Operating, Franks Farms, LLC, and Three “N” One Production, Inc.  All three Parties responded to the NOFIs and after review of the provided information, Three “N” One Production, Inc. was identified as the RP.  Mr. Lee A. Green, Jr., of Three “N” One Production, Inc., has expressed an interest in doing the Removal and P&A himself and has filed the appropriate paperwork with LDNR to obtain a work permit.  LDNR and EPA agreed to give Mr. Green until March 18, 2013, to commence P&A operations.

2.1.4 Progress Metrics


Waste Stream Medium Quantity Manifest # Treatment Disposal
           
           
           


  2.2 Planning Section
    2.2.1 Anticipated Activities
The EPA On-Scene Coordinator (OSC) will monitor the RPs progress to assure the removal is completed properly. 

2.2.1.1 Planned Response Activities
If the RP does not complete the removal and well P&A as indicated, EPA will conduct a removal action and well P&A at the facility.

2.2.1.2 Next Steps
Monitor RP.

2.2.2 Issues
Non Known.

  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  3.1 Unified Command

3.2 Cooperating Agencies
Louisiana Department of Natural Resources (LDNR)

4. Personnel On Site
  No information available at this time.

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.

POLREP #1 Last Updated 2/11/2013