2.2.1 Anticipated Activities
Currently, ERRS is seeking bids on a variety of removal related items including warehouse asbestos abatement, concrete work, and warehouse reconstruction. Bids are expected to be submitted next week and decisions on subcontractors made by October 21. Profile soil samples will be collected onsite next week in anticipation of releasing RFQs for landfill disposal by the week of October 21.
Mobilization of equipment and labor to the site and start of excavation work is planned for the week of October 21, 2013.
2.2.1.1 Planned Response Activities
To mitigate the threat to the public health
posed by the asbestos present in surficial and subsurface soils at the Site, as
well as dust inside the former exfoliation facility, the proposed removal
actions are outlined below. The removal will involve the following:
a. As necessary, continue to assess and
characterize threats posed by the Site including sampling of soils for asbestos
contamination in both onsite and offsite areas.
b. Excavate and remove
asbestos-contaminated soils (Areas A, B and E). The excavation depth will be at least one foot
below grade and no more than two feet below grade.
c. To the extent possible, complete
abatement of asbestos inside the onsite warehouse (former exfoliation building).
Because the structural integrity of this building is unlikely to withstand a
thorough abatement process (ie.seq.), power washing) and because a good deal of
the building is made of wood and is therefore difficult, if not impossible, to
fully decontaminate with traditional abatement processes, then the structure
will be demolished and disposed of.
Coordinate with site owner on construction of a new warehouse structure.
d. Fill all excavated areas with clean fill
material using an approved compaction method.
e. Dispose of contaminated soils excavated
pursuant to subparagraph b. above at anEPA-approved offsite disposal facility in
accordance with Section 121(d)(3) of CERCLA and 40 CFR 300.440, and
transport all waste materials in accordance with Department of Transportation (DOT)
rules and regulations.
f. Suppress
dust and control erosion during the removal action.
g. Monitor and
sample as necessary personal and ambient air during removal activities.
h. Restore the
surface features to pre-existing conditions as appropriate.
2.2.1.2 Next Steps
2.2.2 Issues
No issues are noted at this time.
|