United States Environmental Protection Agency
Region X
POLLUTION REPORT



Date:
Wednesday, December 22, 2004
From:
Michael Szerlog

To:
NPFC Polreps, USCG (POLREP List)
Anthony Barber, EPA Region 10 (POLREP List)
Dan Opalski, EPA Region 10 (POLREP List)
Eugene Lee, EPA HQ (POLREP List)
Chris Field, Region 10 List - EPA Region 10
Steve Heaton, IDEQ - LUST Program
Wally Moon, EPA - UST Program
Miguel Bella, USCG
James Werntz, EPA

Subject: 

Progress
Ashton Texaco Oil Release
363 Highway 20, Ashton, ID
Latitude: 44.0750000
Longitude: -111.4600000


POLREP No.:
18
Site #:
Z0A3
Reporting Period:
11/1 to 11/30/04
D.O. #:
64-10-17
Start Date:
5/27/2003
Response Authority:
OPA
Mob Date:
5/27/2003
Response Type:
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
Contract #
RCRIS ID #:
IDR000201400
Reimbursable Account #
Z0A3
FPN#
E03012
 

Site Description

See polrep number 1.


Current Activities

November 1 through 7, 2004:  ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities.  A total of 190 gallons of material recovered to date in the 1,000 gallon tank.

November 8 through 14, 2004:  ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities.  A total of 190gallons of material recovered to date in the 1,000 gallon tank.

November 15 through 21, 2004:  ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities.  A total of 190 gallons of material recovered to date in the 1,000 gallon tank.

November 22 through 30, 2004:  ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities.  A total of 190 gallons of material recovered to date in the 1,000 gallon tank.


Planned Removal Actions

-Continue to recover oil.
-In January/February time frame, install groundwater depression pumping system inside of the current extraction wells to increase the efficiency of oil removal.


Next Steps

-Transportation and Disposal of recovered product as needed.
-EPA submitted an amended Oil Removal Project Plan to address the installation of groundwater depression pumping systems based upon the finding of oil in adjacent off site wells.  This system will increase the efficiency of oil removal.  
-EPA will operate these systems for 6 months and then re-evaluate.


Key Issues

Amended Budget per USCG NPFC approval of amended Oil Removal Project Plan.


Estimated Costs *
  Budgeted Total To Date Remaining % Remaining
Extramural Costs
ERRS - Cleanup Contractor $300,000.00 $173,399.00 $126,601.00 42.20%
RST/START $130,000.00 $96,578.00 $33,422.00 25.71%
PRFA - IDEQ $20,000.00 $19,435.00 $565.00 2.83%
Intramural Costs
USEPA - Direct (Region, HQ) $45,000.00 $20,023.00 $24,977.00 55.50%
 
Total Site Costs $495,000.00 $309,435.00 $185,565.00 37.49%

* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.


response.epa.gov/AshtonTexaco

POLREP #18 Last Updated 12/22/2004