United
States Environmental Protection Agency
Region VI
POLLUTION REPORT
|
Date: |
Friday, December 27, 2013
|
From: |
Adam Adams
|
Subject:
|
2013 Removal Action-Initial & Final
Oklahoma Refining Company
2 West Main,
Cyril, OK
Latitude: 34.8983310 Longitude: -98.1933390
|
POLREP No.: |
6
|
Site #:
|
OKD091598870
|
Reporting Period: |
November 2013
|
D.O. #:
|
|
Start Date: |
10/23/2013
|
Response Authority:
|
CERCLA/OPA
|
Mob Date: |
11/11/2013
|
Response Type:
|
Time-Critical
|
Demob Date: |
11/20/2013
|
NPL Status:
|
NPL
|
Completion Date: |
11/21/2013
|
Incident Category:
|
Removal Action
|
CERCLIS ID #: |
OKD091598870
|
Contract #
|
|
RCRIS ID #: |
|
Reimbursable Account #
|
|
FPN# |
|
|
Local and state agencies notified and requested assistance from EPA to install fencing around a portion of the Site where drainage accumulates into a pond area. Notifications indicated that local children began accessing this pond area, which contained residual contaminants from previous facility operations.
The portion of the Site that was being accessed is south of the railroad tracks between two fenced in areas.
|
EPA activated ERRS contractors, who mobilized and installed approximately 1,650 feet of six foot tall chain-link fencing with three strands barbed wire across the drainage area that includes the pond. Additionally, signage was installed to notify unathorized persons that access was prohibited.
|
No further actions will be taken under this Removal Action.
|
Note that the budget for this Removal Action was only $65,000.00 with an additional $10,000.00 for intramural expenditures. Of the budget, it is estimated that ERRS costs are less than $44,000.00 and EPA Direct and Indirect are less than $10,000.00.
Total Removal Project Ceiling $8,412,000.00. Total Removal Project Ceiling from Regional Removal Allowance $5,689,000.00.
|
No wastes were accumulated or generated from this Removal Action (2013 Fencing).
|
response.epa.gov/ORC
|