POLLUTION REPORT
|
| Date: |
Friday, December 27, 2013
|
| From: |
Adam Adams
|
| To: |
Ronnie Crossland, Response and Prevention Branch
|
Scott Thompson, Oklahoma DEQ
|
|
Monty Elder, ODEQ
|
Reggie Cheatham, EPA HQ
|
|
Subject:
|
2013 Removal Action-Initial & Final
Oklahoma Refining Company
2 West Main,
Cyril, OK
Latitude: 34.8983310 Longitude: -98.1933390
|
| POLREP No.: |
6
|
Site #:
|
OKD091598870
|
| Reporting Period: |
November 2013
|
D.O. #:
|
|
| Start Date: |
10/23/2013
|
Response Authority:
|
CERCLA/OPA
|
Mob Date: |
11/11/2013
|
Response Type:
|
Time-Critical
|
| Demob Date: |
11/20/2013
|
NPL Status:
|
NPL
|
| Completion Date: |
11/21/2013
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
OKD091598870
|
Contract #
|
|
| RCRIS ID #: |
|
Reimbursable Account #
|
|
| FPN# |
|
|
|
Local and state agencies notified and requested assistance from EPA to install fencing around a portion of the Site where drainage accumulates into a pond area. Notifications indicated that local children began accessing this pond area, which contained residual contaminants from previous facility operations.
The portion of the Site that was being accessed is south of the railroad tracks between two fenced in areas.
|
|
EPA activated ERRS contractors, who mobilized and installed approximately 1,650 feet of six foot tall chain-link fencing with three strands barbed wire across the drainage area that includes the pond. Additionally, signage was installed to notify unathorized persons that access was prohibited.
|
|
No further actions will be taken under this Removal Action.
|
|
Note that the budget for this Removal Action was only $65,000.00 with an additional $10,000.00 for intramural expenditures. Of the budget, it is estimated that ERRS costs are less than $44,000.00 and EPA Direct and Indirect are less than $10,000.00.
Total Removal Project Ceiling $8,412,000.00. Total Removal Project Ceiling from Regional Removal Allowance $5,689,000.00.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$1,205,000.00 |
$1,184,000.00 |
$21,000.00 |
1.74% |
| IAGs (ACE/DOT) |
$4,471,000.00 |
$4,471,000.00 |
$0.00 |
0.00% |
| Contingency |
$13,000.00 |
$0.00 |
$13,000.00 |
100.00% |
| RST/START/USCG |
$130,000.00 |
$130,000.00 |
$0.00 |
0.00% |
|
Intramural Costs
|
| USEPA - Direct (Region, HQ) |
$135,000.00 |
$135,000.00 |
$0.00 |
0.00% |
| USEPA - InDirect |
$2,458,000.00 |
$2,458,000.00 |
$0.00 |
0.00% |
| |
| Total Site Costs |
$8,412,000.00 |
$8,378,000.00 |
$34,000.00 |
0.40% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
|
No wastes were accumulated or generated from this Removal Action (2013 Fencing).
|