1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
B4W8 |
|
Contract Number: |
|
|
D.O. Number: |
|
|
Action Memo Date: |
7/24/2013 |
|
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
|
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
|
Mobilization Date: |
9/16/2013 |
|
Start Date: |
8/28/2012 |
|
Demob Date: |
11/19/2013 |
|
Completion Date: |
11/30/2013 |
|
CERCLIS ID: |
SCN000410886 |
|
RCRIS ID: |
|
|
ERNS No.: |
|
|
State Notification: |
|
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Inactive Production Facility
1.1.2 Site Description
1.1.2.1 Location
The Rownd And Sons Site (the "Site") is located at 800 Martin Luther King Jr Boulevard, Dillon, South Carolina. The property is approximately 9.5 acres and consists of 4-5 buildings. The site is surrounded by a mix of residential and commercial (mainly restaurants) properties.
1.1.2.2 Description of Threat
Rownd and Sons manufactured wooden baskets and veneer. The plant closed in 2001. At that time, the power company disconnected the power, and vandals and copper thieves broke into the facility. Eventually, a 529-gallon transformer containing PCB oil was broken open, releasing its entire contents onto the ground. The buildings are in an advanced state of disrepair, and portions have already collapsed. The main building is laced with asbestos piping, much of which is already damaged and releasing fibers into the environment through the open bay doors, missing siding panels, and collapsed portions of the structure.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Under a Brownfield grant from the South
Carolina Department of Health and Environmental Control (DHEC), the City of
Dillon hired S&ME to perform a Phase I Environmental Site Assessment (ESA) of
the property in September 2006. During the assessment, S&ME identified
multiple recognized environmental conditions (REC) regarding the Site.
Also under the Brownfield grant,
in September 2007, Midlands conducted a Tier 1 Assessment on the UST. Their
findings confirmed petroleum constituents (benzene, ethylbenzene, toluene,
methyl tert-butyl ether [MTBE], and naphthalene) at levels above the South
Carolina Risk-Based Screening Levels (RBSL) in both the soil and groundwater
and lead levels above the RBSLs in the groundwater.
CTC Public Benefit Corporation, working for the City under another Brownfield grant produced a Phase II ESA
Report in July 2012, which verified most of the Phase I findings, except noting
that many of the ASTs had been taken out of service and were stacked in a pile
on-site. The 15,000-gallon tank remained, however.
CTC collected soil, sediment, and
groundwater samples over three separate sampling events to identify, quantify,
and delineate the contamination on-site. Their sampling identified low levels
of several contaminants at levels equal to or greater than the EPA Region 4
Regional Screening Levels (RSL) for residential soils. These contaminants
include polynuclear aromatic hydrocarbons (PAH), hexachlorobenzene, 1,2,4,5-tetrachlorobenzene,
arsenic, and vanadium. However, none of these constituents exceeded the Region
4 Removal Management Levels (RML). CTC identified only one constituent that
exceeded the RML: the PCB Aroclor 1260.
CTC found only one location where
the RML for Aroclor 1260 in industrial soil, 74 milligrams per kilogram
(mg/kg), was exceeded. This was where the oil leaked from the Pyranol
transformer east of the assembly building. PCB levels here were noted as high
as 22,000 mg/kg; over 2% by weight. CTC delineated an area approximately 1,720
square feet at the surface and extending for at least eight feet below ground
surface (bgs). CTC also determined that the plume migrated beneath the
Assembly building. It is unknown how far the plume extends under the building.
Although at least three other
large areas were identified as having detectable Aroclor 1260, and there are
detectable levels of it spread throughout much of the Site (in oily sludge in
the materials building, in the northwest corner of the Site, and in the
sediment in the drainage swales along MLK Boulevard), all of these levels fall
below the RML for Aroclor 1260 in industrial soil. In response to the discovery
of large amounts of PCBs above the Toxic Substances Control Act (TSCA) and the
Region 4 RMLs, DHEC requested assistance from the EPA Region 4 Emergency
Response and Removal Branch (ERRB) to perform a removal site evaluation (RSE)
for a potential time-critical removal action at the Site.
On August 28, 2012, the EPA On-Scene Coordinator (OSC)
Jeffery Crowley mobilized to the Site with the Superfund Technical Assessment
and Response Team (START) contractor Oneida Total Integrated Enterprise (OTIE)
to perform a RSE. However, once on the Site, OSC Crowley initiated an emergency
response action to secure and stabilize the abandoned containerized waste and
cordon off the PCB-impacted soil with a temporary fence. An emergency Action
Memorandum was prepared documenting a $250,000 site ceiling. Emergency and
Rapid Response Services (ERRS) contractor, Environmental Restoration (ER),
mobilized to the Site and began the task of rounding up the drums, barrels,
transformers, and other oil-filled equipment throughout the Site. Also present
were boxes of asbestos insulation and pipe wrapping, much of which was unused
and still in its original containers, although weather had damaged the
containers beyond use. The City of Dillon assisted by cutting the brush off
most of the Site to provide access around the Site as well as to reveal additional
hidden equipment. To further secure the site, ER subcontracted for a fence to
be installed around the PCB-impacted soil, and the containers were stored
inside the building prior to demobilization.
After stabilization efforts were completed, OTIE began RSE
activities. OTIE collected a total of 29 samples: 21 bulk asbestos samples, 6
soil samples, and 2 samples of waste oil. The 21 asbestos samples were analyzed using polarized
light microscopy at EMLab P&K in Knoxville, Tennessee. Of the 21 submitted
samples, eight tested positive for asbestos, with percentages ranging from 20 -
90%. Areas that were positive included various pipe wrapping and insulation,
wall insulation, transit pipe, and pipe gaskets. Items that tested non-detect
were the boiler insulation and furnace materials such as the fire doors, brick,
and mortar.
Of the six soil samples, all showed positive detections
for Aroclor 1260. Five of the six showing detections were less than 3 mg/kg, but
the sample collected near the Pyranol transformer revealed a soil concentration
of 12,000 mg/kg of Aroclor 1260. These results confirm DHEC’s findings of
generally low-level PCB contamination throughout the Site but extremely high
levels near the damaged Pyranol transformer. The waste oil samples also showed PCB concentrations of
Aroclor 1260, although at low levels. A sample of one of the pad-mounted
transformers detected 11 mg/kg and a sample of one of the oil circuit breakers
was 1.9 mg/kg. This is probably due to either the equipment having originally
been filled with PCB oil and then retro filled with non-PCB oil or from
servicing by contractors with PCB residue in their equipment.
Approximately 75 containers of material were collected by
ERRS. START performed hazard categorization testing on 24 of them before
demobilizing. Of the 24 tested, two showed potentially hazardous
characteristics as defined at 40 CFR 261 Subpart C. One drum tested positive
for chlorine, indicating potential PCB and another drum has a pH of less than two.
The remaining drums should be field tested and grouped, with all groups then
being sampled for analysis at a laboratory to determine if additional hazardous
constituents not identifiable in field testing are present.
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
Time-Critical removal actions were initiated on September 16, 2013.
2.1.2 Response Actions to Date
During this reporting period the following activities were completed:
- EPA OSC Berry, ERRS, and START remobilized to the site on November 13, 2013.
- START marked out the grids and indicated the excavation depths (2 or 4 feet bgs) to ERRS.
- ERRS excavated the contaminated soil and stockpiled it on site.
- ERRS loaded the soil into 18-wheel dump trucks for transport to the Environmental Quality Company's Belleville, Michigan, landfill. A total of 522 tons of soil was transported.
- The empty transformer hull was also transported to the landfill for treatment and disposal.
- ERRS arranged for transportation of the small containers, universal waste, and used transformer oil to Giant Resource Recovery of Sumter, South Carolina for further processing and treatment.
- The excavation was filled with clean backfill and covered with seed and straw.
- Work crews demobilized on November 19, 2013.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
The owner of the property has been identified as Harry Rownd of Dillon, SC. The owner has been investigated and been found unable to pay for the removal action.
2.1.4 Progress Metrics
| Waste Stream |
Quantity |
Treatment |
Disposal |
PCB-Contaminated Soil, Non-hazardous
|
522 Tons
|
Interment |
Wayne Disposal
49350 N Interstate 94 Service Dr,
Belleville, MI 48111
MID048090833 |
Asbestos-Contaminated Debris, Non-hazardous
|
240 Tons
|
Interment |
Anson County Landfill
375 Dozer Drive,
Polkton, NC 28135
NCDENR 0401-MSWLF-1973
|
Basic Corrosive Liquids, (Sodium Metasilicate), D002
|
20 Gallons
|
Neutralization |
Giant Resource Recovery
1229 Valley Drive
Attalla, AL 35954
ALD070513767
|
Acidic Corrosive Liquids (Tannic Acid), D002
|
20 gallons
|
Neutralization |
Giant Resource Recovery
1229 Valley Drive
Attalla, AL 35954
ALD070513767 |
Acidic Corrosive Liquid, (Hydrochloric Acid), D002
|
`20 Gallons
|
Neutralization |
Giant Resource Recovery
1229 Valley Drive
Attalla, AL 35954
ALD070513767 |
Aerosol Cans, (Flammable Liquid), D001
|
10 Pounds
|
Fuels Blending
|
Giant Resource Recovery
755 Industrial Road
PO Box 1755
Sumter, SC 29150
SCD036275626
|
Flammable Liquids, (Turpentine, Xylene), D001, D018, F003, F005
|
55 Gallons
|
Fuels Blending
|
Giant Resource Recovery
755 Industrial Road
PO Box 1755
Sumter, SC 29150
SCD036275626 |
Flammable Liquids Mixed with Solids, (Xylene, Acetone), D001, F005, F003
|
500 Pounds
|
Fuels Blending |
Giant Resource Recovery
755 Industrial Road
PO Box 1755
Sumter, SC 29150
SCD036275626 |
Used Transformer Oil, Non-hazardous, Contains <50 ppm PCB.
|
500 Gallons
|
Fuels Blending |
Giant Resource Recovery
755 Industrial Road
PO Box 1755
Sumter, SC 29150
SCD036275626 |
Mercury Contained in Manufactured Articles, Universal Waste
|
5 Pounds
|
Recycling |
Giant Resource Recovery
755 Industrial Road
PO Box 1755
Sumter, SC 29150
SCD036275626 |
Fluorescent Lamps, Universal Waste
|
150 Pounds
|
Recycling |
Southeast Recycling Technologies
906 Chase Drive
Johnson City, TN 37604
|
|
|
|
2.2 Planning Section
|
|
|
|
2.2.1 Anticipated Activities
2.2.1.1 Planned Response Activities
All Response activities are completed at this time.
2.2.1.2 Next Steps
All Response activities are completed at this time.
2.2.2 Issues
This response was designed to eliminate the threat of direct human exposure to PCB-contaminated soil. As documented in the Action Memo, the selected response activity was intended to remove only the surficial contamination in the soil. As such, excavation only occurred at either a 2-foot or 4-foot depth. Average PCB concentrations at the 2-foot depth after excavation was 110 mg/kg, and the concentration at the 4-foot depth was 650 mg/kg. Although a normal dispersion pattern would have the lower concentrations at the deeper depth, it should be noted that the areas excavated to 4 feet were excavated solely because of extremely high concentrations at the surface and 2-foot intervals. Contamination in these areas was shown to deeper than 12 feet below the surface. Any land disturbance in the excavation area should be limited to the first 2 feet of soil, i.e. the uncontaminated backfill.
|
|
|
2.3 Logistics Section
|
|
|
|
No information available at this time.
|
|
|
2.4 Finance Section
|
|
|
|
No information available at this time.
|
|
|
2.5 Other Command Staff
|
|
|
|
No information available at this time.
|
|
3. Participating Entities
|
|
|
City of Dillon
Dillon County
South Carolina Department of Environmental Control
US EPA
|
|
4. Personnel On Site
|
|
|
Maximum Personnel On-Site during this reporting period:
1 USEPA OSC
1 START (Otie)
7 ERRS (ER)
|
|
5. Definition of Terms
|
|
|
No information available at this time.
|
|
6. Additional sources of information
|
|
|
No information available at this time.
|
|
7. Situational Reference Materials
|
|
|