1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
|
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
|
Response Authority: |
OPA |
|
Response Type: |
Emergency |
Response Lead: |
PRP |
|
Incident Category: |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
|
|
Start Date: |
1/31/2014 |
Demob Date: |
1/31/2014 |
|
Completion Date: |
2/3/2014 |
CERCLIS ID: |
|
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
MassDEP |
FPN#: |
E14104 |
|
Reimbursable Account #: |
2/V/SZ/172/95/0/E14104/74100/XXXX |
1.1.1 Incident Category
Oil Spill Emergency Response: 11,500 gal home heating fuel oil tanker truck rolled over compromising three of the 4 compartments spilling 5000 - 7000gals of oil onto the ground.
1.1.2 Site Description
Wooded median along US route 6 eastbound in Barnstable, MA.
1.1.2.1 Location
US Rt 6 at mile marker 71.6 in Barnstable, MA.
1.1.2.2 Description of Threat
Threat of release of an 11,500gal home heating oil tanker that had rolled over along US route 6 Barnstable, MA with an approximate release of 5000 - 7000gals of heating oil.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Three of the 4 compartments on the tanker truck were breached spilling 5000 - 7000gals of home heating fuel oil onto the ground. The spill occurred 1/2 mile from a public drinking well. The US EPA is coordinating with the Massachusetts State Drinking Water Program. MassDEP contractor was charged with capping the tanker. The PRP has hired a cleanup contractor and a vac truck. The home heating oil has seeped into the soil and has not reached navigable waters. No drinking water wells have been closed at this time. Contractor mitigation efforts are to continue to remove product from tank and excavate impacted soils throughout the night. There are no known impacts to groundwater at this time.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
2.1.2 Response Actions to Date
The US EPA is coordinating with the Massachusetts State Drinking Water Program. MassDEP contractor was charged with capping the tanker. The PRP has hired a cleanup contractor and a vac truck. The home heating oil has seeped into the soil and has not reached navigable waters. No drinking water wells have been closed at this time. Contractor mitigation efforts are to continue to remove product from tank and excavate impacted soils throughout the night. There are no known impacts to groundwater at this time.
The tanker has been removed and towed to another location. TMC has set up and will dig approximately 20 to 30 yards of soil tonight before securing the area until tomorrow morning. All of the oil released appears to have soaked into the ground immediately beneath the tanker. Depth to ground water is not known but it is expected to be greater than 50 feet.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
DJ Cronin
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
2.2.1.1 Planned Response Activities
2.2.1.2 Next Steps
Incident details were forwarded to the US EPA Drinking Water Branch.
2.2.2 Issues
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
3.1 Unified Command
MassDEP
DOT
USEPA
3.2 Cooperating Agencies
|
4. Personnel On Site
|
|
US EPA Brent England, OSC
MassDEP Andy Jones
MassDEP Jamie Gonzales
|
5. Definition of Terms
|
|
MassDEP: Massachusetts Department of Environmental Protection
DOT: Department of Transportation
US EPA: United States Environmental Protection Agency
OSC: Federal On Scene Coordinator
|
6. Additional sources of information
|
|
6.1 Internet location of additional information/report
http://www.boston.com/news/local/massachusetts/2014/01/31/traffic-woes-expected-cape-after-truck-route-rolls-over-spills-load-heating-oil/ChmnGFVjXmkvl6pjCEAxWM/story.html
6.2 Reporting Schedule
|
7. Situational Reference Materials
|
|
No information available at this time.
|