United
States Environmental Protection Agency
Region X
POLLUTION REPORT
|
Date: |
Wednesday, January 19, 2005
|
From: |
Michael Szerlog
|
To: |
Steve Heaton, IDEQ - LUST Program
|
Miguel Bella, USCG
|
Subject:
|
Progress
Ashton Texaco Oil Release
363 Highway 20,
Ashton, ID
Latitude: 44.0750000 Longitude: -111.4600000
|
POLREP No.: |
19
|
Site #:
|
Z0A3
|
Reporting Period: |
12/1 to 12/31
|
D.O. #:
|
64-10-17
|
Start Date: |
5/27/2003
|
Response Authority:
|
OPA
|
Mob Date: |
5/27/2003
|
Response Type:
|
Emergency
|
Demob Date: |
|
NPL Status:
|
Non NPL
|
Completion Date: |
|
Incident Category:
|
Removal Action
|
CERCLIS ID #: |
|
Contract #
|
|
RCRIS ID #: |
IDR000201400
|
Reimbursable Account #
|
Z0A3
|
FPN# |
E03012
|
|
December 1 through 5, 2004: ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities. A total of 191 gallons of material recovered to date in the 1,000 gallon tank.
December 6 through 12, 2004: ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities. A total of 191 gallons of material recovered to date in the 1,000 gallon tank.
December 13 through 19, 2004: ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities. A total of 191 gallons of material recovered to date in the 1,000 gallon tank.
December 20 through 26, 2004: ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities. A total of 191 gallons of material recovered to date in the 1,000 gallon tank.
December 27 through 31, 2004: ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities. A total of 192 gallons of material recovered to date in the 1,000 gallon tank.
|
-Continue to recover oil. -During the week of February 14th 2005, EPA plans to install a groundwater depression pumping system inside of the current extraction wells to increase the efficiency of oil removal. The pumping system will continuously pump groundwater from the three on site extraction wells, treat the groundwater, and then discharge it (under permit) to the city of Ashton's POTW.
|
-Transportation and Disposal of recovered product as needed. -Amended Oil Removal Project Plan to address the installation of groundwater depression pumping systems was approved by USCG NPFC for funding. -EPA to mobilize week of February 14, 2005 to install pumping system. -EPA will operate these systems for another 6 months and then re-evaluate.
|
New Budget listed below - USCG NPFC approval of amended Oil Removal Project Plan.
|