RESPONSE ACTIVITIES
Asbestos and Mercury Waste
The EPA Emergency and Rapid Response Services (ERRS) contractor completed the off-site shipment of asbestos and mercury waste on 10/17/14. Five cubic yards of asbestos were shipped off-site along with one 55 gallon drum of mercury contaminated debris and one 55 gallon drum of mercury containing devices. A listing of disposal locations can be found in the waste disposition table at the end of this section.
Drum/Container Waste
The wastes identified in 15 on-site drums were haz-catted on 9/18/14 and bulked successfully during the week of 9/22/14. Drum wastes were bulked based on their hazard classifications. Bulked wastes were sampled on 10/7/14 with samples submitted to a NELAP certified laboratory for waste characterization analysis.
Waste characterization analysis for the drum waste was received on 10/27/14. An RFQ for the transportation and disposal (T&D) was finalized and put on the street 10/29/14. Bids were received and evaluated during the week of 11/4/14 with the T&D bid being awarded on 11/7/14. Waste profiles and shipping papers were prepared during the week of 11/10/14 and all drum wastes were shipped off-site on 11/17/14.
The drum waste included RCRA hazardous wastes, ignitable (D001), as well as non-RCRA regulated wastes including corrosive solids (basic), corrosive solids (acidic), and neutral solids. A listing of disposal locations can be found in the waste disposition table at the end of this section.
As of November 18, 2014, all generated waste has been shipped off-site and all the EPA ERRS and Removal Support Team (RST) contract resources utilized for this action have been demobilized from the Site.
ASSESSMENT ACTIVITIES
On September 16-17, 2014, the EPA RST contractor collected a total of 41 bulk material samples from 23 distinct locations. The bulk samples were submitted to a NYS ELAP accredited laboratory for asbestos analysis by NY ELAP 198.1 method. The samples were collected from suspect ACM with the primary focus being on plaster materials within Site buildings. Plaster samples (ceiling and wall) were collected from buildings 2, 3, 7, 8, 9, 12, and 23. In most cases, samples were collected from both the scratch coat and finish coat of the plaster area. Ten of the plaster material samples, from five distinct locations, were reported as positive for asbestos (chrysotile). The results ranged from 10.81% to 23.53%. All ten samples were collected from ceiling plaster material. The samples testing positive for asbestos were collected in buildings 2, 3, and 7.
Seven bulk samples, from six distinct locations, were collected from building 8. All building 8 samples were reported as non-detect for asbestos. Only areas on the first floor were sampled due to the poor integrity of the building structure. Samples were collected from areas where plaster was still in-tact on walls and ceilings as well as from plaster materials that were believed to have fallen off of walls and ceilings. While the samples were all reported as non-detect, Suspect ACM material was observed in the basement of this building in the form of thermal systems insulation (TSI) on old piping.
Assessment sampling activities for ACM was not intended to fully characterize the Site buildings in terms of all ACM but rather to augment some of the previous sampling activities conducted under NYSDEC contracted work. While much of the sampled material was reported as non-detect, data exists from past NYSDEC reports that indicates the presence of ACM within some of the Site buildings. EPA is currently reviewing the most recent assessment data and data reported in NYSDEC reports related to friable asbestos containing materials.
On September 16, 2014, the EPA RST contractor collect a total of five chip samples from oil-stained wood-block flooring within building 12. These samples were collected from four distinct locations. Chip samples were collected from the oil-stained lens of wood-blocks found in the building. The samples were analyzed for target compound list (TCL) polychlorinated hydrocarbons (PCBs) via EPA method SW846 8082. Three of the five samples (including 1 duplicate) were reported as containing Aroclor 1254 with results ranging from 1.9(J) mg/kg to 19.1(J) mg/kg. Three of the four locations sampled reported results as containing PCBs.
ENFORCEMENT ACTIVITIES
No viable potentially responsible parties (PRPs) have been identified at this point in time. EPA will continue to work to identify any viable PRPs.
WASTE DISPOSITION TABLE
| Waste Stream |
Quantity |
Manifest # |
Disposal |
| Mercury Containing Devices and Contaminated Debris(10/17/2014) |
(2) 55 gal drum |
012915188 |
Retort/Recovery
WM Mercury Waste
Union Grove, WIRCRA ID - WIR000000356 |
| Asbestos Containing Material (ACM)(10/17/2014) |
(5) 1 cubic yard boxes |
JL-001 |
Wayne DisposalBelleville MIRCRA ID - MID048090633 |
| RCRA CharacteristicIgnitability (D001)(11/17/2014) |
95 gal |
013709104 JJK |
Tradebe Treatment & RecyclingEast Chicago, INRCRA ID – IND000646943 |
| Corrosive Solids (Basic) (11/17/2014) |
725 lbs |
798635 |
Tradebe Treatment & RecyclingBridgeport, CTRCRA ID – CTD002593887 |
| Corrosive Solids (Acidic) (11/17/2014) |
200 lbs |
798635 |
Tradebe Treatment & RecyclingBridgeport, CTRCRA ID – CTD002593887 |
Neutral Solids
(11/17/2014) |
700 lbs |
798635 |
Tradebe Treatment & RecyclingBridgeport, CTRCRA ID – CTD002593887 |
|