1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
A4Y8 |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
|
Response Authority: |
CERCLA |
|
Response Type: |
Emergency |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
11/12/2014 |
|
Start Date: |
11/12/2014 |
Demob Date: |
11/13/2014 |
|
Completion Date: |
|
CERCLIS ID: |
TND073544314 |
|
RCRIS ID: |
|
ERNS No.: |
1100830 |
|
State Notification: |
11/12/2014 |
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
This is an emergency response initiated under the On-Scene Coordinators (OSC) warrant authority.
1.1.2 Site Description
The Site is a former drum reconditioning business. The business is closed and all process equipment has been removed from the property. Due to changes in the surrounding land use from commercial/industrial to residential, the Tennessee Department of Environment & Conservation (TDEC) requested the U. S. Environmental Protection Agency (EPA) Emergency Response & Removal Branch (ERRB) conduct a removal site evaluation (RSE) at the property.
1.1.2.1 Location
The property is located a 4 East Virginia Avenue, Memphis, Shelby County, Tennessee. The area around the Site is undergoing urban revitalization, and the Site is surrounded by residential apartment homes.
1.1.2.2 Description of Threat
During the RSE activities on November 12, 2014, the EPA OSC discovered two subgrade sumps that contained an unknown black liquid and sludge material. The origin of the material is suspected to be from the past facility operations. Piping leading to and from the sumps was observed, but the final discharge points could not be identified. The material could be migrating to a storm sewer or overflowing to surface soils.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Based on the OSC's observations of the unknown waste material, and potential for a release of hazardous substances to the environment, an emergency response was initiated to address the the material in the sumps.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
EPA contacted ERRS contractor CMC, Inc., who utilized local contractor U. S. Environmental Services (USES), to provide a vacuum truck to start removing the material from the sumps.
2.1.2 Response Actions to Date
On November 12, 2014, USES removed approximately 200 gallons of liquid and sludge from the sumps. Debris and solids remained in the sumps, so it was decided to return to the Site on November 13, 2014, with additional equipment and labor to physically remove the debris and solids. Once the solids and debris were removed, a pressure washer was utilized to remove residual waste material from the sumps.
USES completed the work on November 13th. The sump cleanup yielded 4, 55 gallons drums and 1 tote of waste material. The material was transported to the USES shop for securing and sampling for waste disposal.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
The Jehl Cooperage company is bankrupt. An EPA attorney and cost recovery person have been assigned to the Site. Historical files will be evaluated to determine if viable responsible parties exist.
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
unknown dark liquid and solids |
|
1 tote |
|
|
|
dark solids/sludges/debris |
|
4 drums |
|
|
|
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
The waste will be sampled for disposal and bids obtained for transport and disposal to an appropriate waste facility.
2.2.1.1 Planned Response Activities
2.2.1.2 Next Steps
2.2.2 Issues
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
No information available at this time.
|
4. Personnel On Site
|
|
No information available at this time.
|
5. Definition of Terms
|
|
No information available at this time.
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|
No information available at this time.
|