1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
10MC |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
8/28/2014 |
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
10/13/2014 |
|
Start Date: |
10/13/2014 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
WAN001002396 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Time-Critical Removal Action
1.1.2 Site Description
See initial POLREP.
1.1.2.1 Location
See initial POLREP.
1.1.2.2 Description of Threat
See initial POLREP.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
See initial POLREP.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
June 29 - July 2, 2015
SWPPP controls and BMPs were inspected on-site prior to work
each day. Shaping of the impoundment was completed. Flat concrete remaining in
the Mill area was broken up and placed on the impoundment. Approximately 5,000 cubic
yards (cyds) of contaminated material were excavated from the Mill Area and
placed on the impoundment. Approximately 30 cyds of contaminated material were
excavated east of the ‘cedar tree’ area and placed on the impoundment. Approximately
8,000 cyds of ecological barrier material was excavated and placed on the
impoundment. Two air samples were collected during removal activities. The samples were analyzed for lead using NIOSH Method 7300. Sample results for the samples collected the week of June 22 were received, all samples were below the detection limit.
July 6 - 10, 2015
SWPPP controls and BMPs were inspected on-site prior to work each day. Approximately 5,000 cyds of ecological barrier were excavated and placed on the impoundment. Approximately 5,800 cyds of cover material was excavated and placed on the impoundment. Thickness of the ecological barrier and cover soils has been guided by grade stakes. Approximately 300 cyds of fill were excavated and placed east of Goldfield Mine Road to return the area to previous grade. Due to equipment breakdowns, work stopped on July 9 and resumed on July 10, 2015. Two air samples were collected during removal activities on July 8. The samples were analyzed for lead using NIOSH Method 7300. Sample results for the samples collected the week of June 29 were received, all samples were below the detection limit.
2.1.2 Response Actions to Date
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
Excavation and placement of ecological barrier and cover soils will continue. Excavated material will be placed on the impoundment and thickness will be guided by grade stakes. Projected completion of cover installation is mid to late August 2015.
2.2.1.1 Planned Response Activities
2.2.1.2 Next Steps
2.2.2 Issues
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
3.1 Unified Command
3.2 Cooperating Agencies
Colville Confederated Tribes
Washington State Department of Ecology
|
4. Personnel On Site
|
|
June 29 - July 2, 2015
EPA: None
START: None
REMC: 1 employee
ACI: 5 employees
July 3 - 10, 2015
EPA: None
START: None
REMC: 1 employee
ACI: 5 employees
|
5. Definition of Terms
|
|
No information available at this time.
|
6. Additional sources of information
|
|
6.1 Internet location of additional information/report
6.2 Reporting Schedule
RMC is providing weekly reports.
|