1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
C56Y |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
|
Response Authority: |
CERCLA |
|
Response Type: |
Emergency |
Response Lead: |
PRP |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
|
|
Start Date: |
4/17/2015 |
Demob Date: |
|
|
Completion Date: |
7/20/2015 |
CERCLIS ID: |
MIN000505825 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
Incident Category
PRP CERCLA Emergency Response
Site Description and Location
The Azzo site is an abandoned auto repair shop located
at 24052 W. McNichols Avenue, Detroit, Michigan 48219 and is approximately one half of an acre in size. The site is located in an area of Detroit
that is characterized by residential and commercial development. An Environmental Justice analysis for the site indicated there was a high potential for EJ concerns.
Description of Threat
The site was discovered by the Detroit Fire Marshall’s office
who documented 40 containers of waste. An EPA site visit found evidence that the contents in the drums and small containers included ignitable and corrosive hazardous wastes, as defined by 40 C.F.R. § 261.21 (characteristic of ignitability) and 40 C.F.R. § 261.22 (characteristic of corrosivity), which are considered hazardous substances under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). These hazardous wastes were abandoned, unsecured, and a potential threat to human health and the environment.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
Narrative
EPA located the owner of the facility, who agreed to remove the wastes and secure the building. On July 10, EPA reassessed the facility; the 55 gallon drums and the majority of small containers had been removed, the entrances to the building had been secured, and the owner was in the process of having power restored and an alarm system installed. The owner stated the three remaining 5-gallon containers were to be used in the new business. As they were unused, and the building was now secured, no further action was taken.
Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
AMN Investments LLC
Estimated Cost: $3,500
Progress Metrics
Regional Metrics |
This is an Integrated River Assessment. The numbers should
overlap. |
Miles
of river systems cleaned and/or restored |
0 |
Cubic yards of contaminated sediments removed
and/or capped |
0 |
Gallons of oil/water recovered |
0 |
Acres of soil/sediment cleaned up in
floodplains and riverbanks |
0 |
Stand Alone Assessment |
Number
of contaminated residential yards cleaned up |
0 |
Number of workers on site |
2 |
Contaminant(s)
of Concern |
Flammable
and Corrosive |
Oil
Response Tracking |
Estimated volume |
Initial
amount released |
N/A |
Final amount collected |
N/A |
CANAPS Info |
FPN
Ceiling Amount |
N/A |
FPN Number |
N/A |
Body of Water affected |
N/A |
Administrative
and Logistical Factors (Place X where applicable) |
|
Precedent-Setting HQ
Consultations (e.g., fracking, asbestos) |
|
Community challenges or high
involvement |
|
Radiological |
|
More than one
PRP |
|
Endangered
Species Act / Essential Fish Habitat issues |
|
Explosives |
|
AOC |
|
Historic
preservation issues |
|
Residential
impacts |
|
UAO |
|
NPL site |
|
Relocation |
|
DOJ involved |
|
Remote location |
|
Drinking water
impacted |
|
Criminal
Investigation Division involved |
|
Extreme weather
or abnormal field season |
X |
Environmental
justice |
|
Tribal
consultation or coordination or other issues |
|
Congressional
involvement |
|
High media
interest |
|
Statutory
Exemption for $2 Million |
|
Statutory
Exemption for 1 Year |
|
Active fire
present |
|
Hazmat Entry
Conducted – Level A, B or C |
|
Incident or
Unified Command established |
|
Actual air
release (not threatened) |
Waste Stream |
Medium |
Quantity |
Disposal |
Flammable
|
Liquids |
100 gallons
|
|
Chorrosive |
Liquid |
50 gallons
|
|
Debris |
Solid
|
20 cubic yards
|
|
|
|
2.2 Planning Section
|
|
|
Anticipated Activities
None - site closed
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
No information available at this time.
|
4. Personnel On Site
|
|
No information available at this time.
|
5. Definition of Terms
|
|
No information available at this time.
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|
No information available at this time.
|