OSC Adams with the Region 4 Emergency Response and Removal Branch (ERRB), initiated the emergency response action at the site. EPA tasked WRS Infrastructure and Environment to assist with the removal and sampling of the drums, excavate contaminated soils, and transportation and disposal as appropriate. EPA tasked Weston Solutions to provide over-sight of the response, conduct air sampling, assist in sampling of the drums, and take confirmation samples and analyze the samples after removal of contaminated soils was completed.
|