1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
|
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
|
Response Authority: |
OPA |
|
Response Type: |
Pre-Deployment |
Response Lead: |
EPA |
|
Incident Category: |
Removal Assessment |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
|
|
Start Date: |
10/14/2015 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
|
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
000000 |
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Threat assessment
1.1.2 Site Description
Partially filled, deteriorated, 10,000 gal #6 oil tank in an abandoned paper converter (toilet paper) mill.
1.1.2.1 Location
The mill and oil tank are located on the north bank of the Battenkill River, a major fishing and recreational waterway that is a tributary of the Hudson River.
1.1.2.2 Description of Threat
The threat is the possibilty that oil remaining in the deteriorated tank could be released into the Battenkill River.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
To be determined.i
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
2.1.2 Response Actions to Date
Since 2002 there has been one CERCLA PRP oversight removal action, 3 CERCLA Fund-lead removal actions and on OPA removal action performed at this site.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
There is one PRP, the son of the former owner who is now deceased. He has previously demonstrated to not have the financial resources necessary to conduct a removal action.
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
#6 oil
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
Mobilize RST to the site to stick the tank with oil tape to measure the amount of #6 oil in the tank.
2.2.1.1 Planned Response Activities
See above.
2.2.1.2 Next Steps
See above.
2.2.2 Issues
None.
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
No information available at this time.
|
4. Personnel On Site
|
|
No information available at this time.
|
5. Definition of Terms
|
|
No information available at this time.
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|
No information available at this time.
|