Work continues during this reporting period on prepping the recovery well system (system) for removal of product, in the vicinity of the seeps. On 4/14/05 approximately 1000 gallons of a fuel and water mixture was vacuumed from the system into a prestaged frac tank. Approximately 800 gallons of this mixture was diverted into a tanker truck for off-site recycling. Additional removal of fuel from the system, will continue thru the weeks of 4/18 and 4/25.
On 4/11 and 4/12/05 USACE's contractor completed the installation of a monitoring well in the vicinity of Fogle's old above ground storage tank farm. This farm was located just upgradient (approx 50ft.) of the well MWA01. A fuel sample from this well will be forwarded to USCG Coil Lab for fingerprinting purposes.
On April 08, 2005, the FOSC issued a Notice of Federal Interest in a Pollution Incident to Fogle's.
|