POLLUTION REPORT
|
| Date: |
Monday, May 2, 2005
|
| From: |
Brian Kelly
|
| To: |
L Nachowicz, EPA
|
J El-Zein, EPA
|
|
M Canavan, EPA
|
T Krueger, EPA
|
|
R Woodfork, EPA
|
David Novak, EPA
|
|
Erik Janus, MDCH
|
M Hans, EPA
|
|
M Chezik, DOI
|
D Chung, EPA - HQ
|
|
Tracy Johnson, EPA
|
M Johnson, ATSDR
|
|
S Kitler, DEQ
|
B Boyle, MDCH
|
|
J Walczak, DEQ
|
P King, EPA
|
|
N Seif, DEQ
|
A Marouf, EPA
|
|
J Mackey, Congressman Conyers
|
G Howard, DLEG
|
|
T Vincent, DEQ
|
J Kawecki, EPA
|
|
Cheryl Allen, EPA
|
Amina El-Husseini, City of Dearborn
|
|
Hikmet Jamil, ACCESS
|
T Harper, Dearborn Police Department
|
|
Subject:
|
Onsite Excavation Complete
W.R. Grace Dearborn (N-Forcer)
14300 Henn Street,
Dearborn, MI
Latitude: 42.3384602 Longitude: -83.1833698
|
| POLREP No.: |
3
|
Site #:
|
B55P
|
| Reporting Period: |
04/23/05 - 5/2/05
|
D.O. #:
|
|
| Start Date: |
4/4/2005
|
Response Authority:
|
CERCLA
|
Mob Date: |
4/4/2005
|
Response Type:
|
Time-Critical
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
MIN 000 508 756
|
Contract #
|
|
| RCRIS ID #: |
|
|
|
Soil sampling based on the air deposition model and visual inspections has been completed. ERT collected a total of 97 soil samples for laboratory analysis. Of those 97 soil samples collected; • 3 samples were collected on site for confirmation, • 3 samples were collected off site from commercial properties, • 91 samples were collected off site from residential properties. Sample results are expected by May 9.
On-site excavation, transportation, and disposal have been completed. Asbestos is an inhalation threat; material 18-24in below ground surface was not removed. Geotextile fabric was placed on the excavation floor. Backfilling and restoration is underway.
|
|
1. Site restoration including backfilling and reseeding of Area 2 and Area 3; 2. Repave east parking areas; 3. Work with CSX Transportation, Inc on cleanup of railroad property
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$280,000.00 |
$219,502.00 |
$60,498.00 |
21.61% |
| START |
$100,000.00 |
$41,000.00 |
$59,000.00 |
59.00% |
| REAC |
$92,000.00 |
$66,000.00 |
$26,000.00 |
28.26% |
|
Intramural Costs
|
| USEPA - Direct |
$65,000.00 |
$26,100.00 |
$38,900.00 |
59.85% |
| |
| Total Site Costs |
$537,000.00 |
$352,602.00 |
$184,398.00 |
34.34% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
| Waste Stream |
Quantity |
Manifest # |
Disposal Facility |
| Asbestos Contaminated Soil and Debris |
1330 cubic yards |
|
Sauk Trail Hills Development (landfill), Canton Township, MI 48188 |
response.epa.gov/wrgdearborn
POLREP #3 Last Updated 5/2/2005
|