Executive Summary
|
|
|
No information available at this time.
|
|
1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
A25L |
|
Contract Number: |
EP15-S2-02 |
|
D.O. Number: |
027 |
|
Action Memo Date: |
12/31/2015 |
|
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
|
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
|
Mobilization Date: |
1/25/2016 |
|
Start Date: |
1/25/2016 |
|
Demob Date: |
|
|
Completion Date: |
|
|
CERCLIS ID: |
NYN000201779 |
|
RCRIS ID: |
|
|
ERNS No.: |
|
|
State Notification: |
|
|
|
|
1.2 Incident Objectives
|
|
|
|
No information available at this time.
|
|
|
1.3 Critical Resource Needs
|
|
|
|
No information available at this time.
|
|
|
1.4 Strategic Considerations
|
|
|
|
No information available at this time.
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
2.1.2 Response Actions to Date
Current information is in bold font.
This SITREP is being issued to correct inaccurate information reported in SITREP #8. It had been erroneously reported that two loads of asbestos waste had been shipped off-Site on 3/17/2016. In fact, there was only one load shipped on 3/17, amounting to 25 cubic yards, not the 60 yards initially reported.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
There are a number of known PRPs, including the current owner and one of the former partners of
Conifer Construction. Co.and he has given EPA written
access to the entire site. Enforcement staff continue to identify additional PRPs.
2.1.4 Progress Metrics
| Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
| propane |
gas |
300 lbs
|
n/a |
recycled |
|
| asbestos |
solid |
25 cu. yds. |
n/a |
none |
landfill |
| |
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
|
No information available at this time.
|
|
|
2.3 Logistics Section
|
|
|
|
No information available at this time.
|
|
|
2.4 Finance Section
|
|
|
|
|
|
|
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$900,000.00 |
$0.00 |
$900,000.00 |
100.00% |
|
Intramural Costs
|
| |
| Total Site Costs |
$900,000.00 |
$0.00 |
$900,000.00 |
100.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
|
|
|
2.5 Other Command Staff
|
|
|
|
No information available at this time.
|
|
3. Participating Entities
|
|
|
No information available at this time.
|
|
4. Personnel On Site
|
|
|
No information available at this time.
|
|
5. Definition of Terms
|
|
|
No information available at this time.
|
|
6. Additional sources of information
|
|
|
No information available at this time.
|
|
7. Situational Reference Materials
|
|
|
No information available at this time.
|
|
SITREP #9 Last Updated 3/18/2016
|