2.1.1 Narrative
AMS
has indicated they do not have the financial means to implement the remainder
of the decommissioning plans. Because of this fact, OBRP has referred this site
to Region 5 for assessment and possible cleanup. EPA assessed the property in the fall of 2015 and is evaluating the data generated.
OBRP and EPA contacted the Site owner and they indicated that they do not have the means to restore power to the property.
2.1.2 Response Actions to Date
On June 15, 2016, OBEHRP contracted with a hazardous materials cleanup company to provide temporary pumping of the sump into a storage tank. OBEHRP also contracted another company to seal the entrance to the building that the vandals gained access through. OBEHRP contractors remained on site overnight to continue pumping accumulated sump water as necessary.
On June 16, 2016, OBEHRP and EPA met to discuss short term actions. OBEHRP requested that EPA take over the temporary pumping operation, provide power to the building in order for the normal pumping operation to resume, and reinforce the barriers to the building that prevent access. EPA agreed to perform these actions.
On June 16, 2016, the EPA ERRS contractor was deployed to the site and assumed control of the hazmat contractor on site. EPA ERRS arranged for an electrician to visit the site on June 17th, and met with companies who can fabricate metal bars to be placed over the building windows for site security. The Ohio Environmental Protection Agency (OEPA) was on site and providing contact information to the OSC in the event consultation is required.
In the evening of June 16, 2016, OBEHRP and EPA learned that the RSO for the site resigned. Entry into the building requires an RSO escort and OBEHRP agreed to provide personnel for this activity. OBEHRP collected water samples from the sump outside the building and the sample collection sump inside the building.
On June 17th, 2016, EPA and OBEHRP entered the building to determine the best course of action for providing electricity to the pumps. An electrical contractor visited the site and indicated that the best course of action would be to install a new panel and run outlets to the priority areas. OBEHRP collected water samples from the outside sump and from the water in the temporary storage tank. Approximately 2,000 gallons of water has been pumped from the outside sump into the storage tank.
EPA will be providing site security during off-shift hours until the building can be further secured. EPA will also provide personnel to pump the outside ump into temporary storage as needed.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
The PRP has been notified of the situation and was given a verbal order by EPA. The PRP indicated that they do not have the means to perform the necessary work to resume the normal pumping operations. OBEHRP also contacted the PRP and ordered them to restore power to the facility and they refused. Due to the resignation of the site's RSO, OBEHRP also ordered the PRP to provide a new RSO for the site as required under the radiological license.
2.1.4 Progress Metrics
| Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
|