United
States Environmental Protection Agency
Region III
POLLUTION REPORT
|
| Date: |
Monday, June 13, 2005
|
| From: |
Dominic Ventura
|
|
Subject:
|
Elkton Farm Firehole
183 Zeitler Rd.,
Elkton, MD
Latitude: 39.6292184 Longitude: -75.8681150
|
| POLREP No.: |
4
|
Site #:
|
A3DH RS
|
| Reporting Period: |
May 2005
|
D.O. #:
|
|
| Start Date: |
|
Response Authority:
|
CERCLA
|
Mob Date: |
|
Response Type:
|
Time-Critical
|
| Demob Date: |
|
NPL Status:
|
NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Assessment
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
|
|
Refer to previous polreps.
|
|
During this reporting period EPA Start contractor, TetraTech Inc. initiated and completed a geophysical survey using a EM-61device. The EM-61 is a high resolution, time-domain device for detecting buried conductive objects. This device with an intercoil spacing of 10 feet and used in the horizontal mode has an effective depth of analysis of approximately 20 feet. This geophysical survey was completed during the week of May 23, 2005. A final report is forthcoming. Preliminary data appears to suggest that surficial discarded military munitions (DMM) is widespread throughout 55 acres of the site. The EM-31 geophysical survey performed by MDE previously was completed over a 32 acre portion of the area. This recent survey supports the MDE survey and expands the area up thru 55 acres. Therefore there is concern that the overall area may be greater than the 55 acres identified during this survey.
On June 03, 2005 the OSC met with US Army Corps of Engineers (USACE) personnel at Edgewood Arsenal, Maryland to discuss USACE project management expertise for large DMM sites and disposal options for this type of material. FOSC will work with USACE in development of costing and cleanup technologies for this pending removal action.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
|
Intramural Costs
|
| |
| Total Site Costs |
$0.00 |
$0.00 |
$0.00 |
0.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/elktonfarmfirehole